导流涵洞的水压爆破拆除DEMOLITION OF A DIVERSION CULVERT BY WATER-PRESSURE BLASTING
许梦国,张汉兴
XU Meng guo 1, ZHANG Han xing 2 (1.Wuhan University of Science and Technology, Wuhan 430081, China; 2.University of Wuhan Iron and Steel Company, Wuhan 430080, China)
摘要(Abstract):
采用钻孔爆破和水压爆破相结合的方法拆除钢筋混凝土三孔导流涵洞。文中论述了钻孔爆破和水压爆破参数的确定、安全技术措施、起爆网络和起爆顺序 ,对作用在涵洞壁上的水中冲击波峰值压力及有关参数进行了计算。此外 ,还介绍了爆破震动监测及对监测结果的分析 ,并在分析的基础上讨论了局部涵洞壁出现裂缝的原因。
A reinforced concrete diversion culvert with three channels was demolished by a method of combining drilling and blasting with water pressure blasting. In this paper, the determination of parameters for drilling and blasting and water pressure blasting, safety precautions, priming network and sequence were expounded, and the peak pressure of in water shock wave on walls of the culvert and relative parameters calculated. In addition, the monitoring of blasting vibration and the analysis on monitoring results were introduced, and the reasons for come up of fissures on partial walls of the culvert discussed based on the analysis.
关键词(KeyWords):
导流涵洞;拆除爆破;水压爆破;震动监测
Diversion culvert; Demolition blasting; Water pressure blasting; Vibration monitoring
基金项目(Foundation):
作者(Authors):
许梦国,张汉兴
XU Meng guo 1, ZHANG Han xing 2 (1.Wuhan University of Science and Technology, Wuhan 430081, China; 2.University of Wuhan Iron and Steel Company, Wuhan 430080, China)
- 许梦国
- 张汉兴
XU Meng guo 1 - ZHANG Han xing 2 (1.Wuhan University of Science and Technology
- Wuhan 430081
- China
- 2.University of Wuhan Iron and Steel Company
- Wuhan 430080
- China)
- 许梦国
- 张汉兴
XU Meng guo 1 - ZHANG Han xing 2 (1.Wuhan University of Science and Technology
- Wuhan 430081
- China
- 2.University of Wuhan Iron and Steel Company
- Wuhan 430080
- China)