工程爆破

2009, v.15;No.55(01) 41-43

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Past Issue) | 高级检索(Advanced Search)

对两面临空矿段的控制爆破
CONTROLLED BLASTING OF ORE BODY OVERHANGING ON BOTH SIDES

夏鹤平;
XIA He-ping(Xinhuadu Engineering Company of Fujian Province,Xiamen 361000,Fujian,China)

摘要(Abstract):

对于某露天矿开采两面临空矿段的控制爆破,采取了以下措施:①利用地形、地物的优势合理地选取爆破参数和布孔;②精确计算每孔装药量,并进行适当调整;③利用两面临空条件,设计起爆网路及延时间隔时间,巧妙地利用起爆时差使爆破产生的反作用力互相抵消。这些措施确保了施工安全及爆破质量,获得了满意的效果。
Some measures were taken in controlled blasting for surface mining of ore body overhanging on both sides,such as ① making good use of landform and ground objects for the determination of blasting parameters and hole layout;② precisely calculating explosive charges for each hole with proper adjustment;and ③ using the condition of location overhanging on both sides to design ignition network and delay time interval which ingeniously uses the ignition moment to offset the anti-action resulted from blasting.These measures guaranteed construction safety and blasting quality and a satisfactory blasting effect.

关键词(KeyWords): 露天矿开采;控制爆破;延时起爆;安生防护
Open pit mining;Controlled blasting;Delay igniting;Safety protection

Abstract:

Keywords:

基金项目(Foundation):

作者(Authors): 夏鹤平;
XIA He-ping(Xinhuadu Engineering Company of Fujian Province,Xiamen 361000,Fujian,China)

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享