150m高钢筋混凝土烟囱双向折叠爆破拆除
DEMOLITION OF A REINFORCED CONCRETE CHIMNEY WITH A HEIGHT OF 150 METERS BY BIDIRECTIONAL FOLDING BLASTING

郑炳旭,傅建秋,王永庆,唐涛,钟伟平
ZHENG Bing-xu~1,FU Jian-qiu~(1,2),WANG Yong-qing~1,TANG Tao~1,ZHONG Wei-ping~1(1.Hongda Blasting Engineering Co Ltd of Guangdong Province,Guangzhou 510055,China;2.University of Science and Technology Beijing,Beijing 100083,China)

摘要(Abstract):

在倒塌场地狭小的条件下,采用双向折叠定向爆破的方法成功地拆除了150m高的钢筋混凝土烟囱。文中讨论了上、下爆破切口形状、位置和参数的选择,根据以往对两个120m烟囱倾倒过程图像资料的分析,确定了上、下爆破切口起爆时差。通过设置缓冲层和竹排栅,减小了烟囱触地震动,并控制了飞石和飞溅物。由于所选择的上、下爆破切口起爆时差过长,上段烟囱下坐时间为4 39s。
In the condition of narrow area for collapsing of the chimney,a reinforced concrete chimney with a height of 150meters was successfully demolished by bi-directional folding blasting.In this paper,selection of the shape,position and parameters of upper and down blasting cuts was discussed.Based on analyzing previous image materials about collapsing process of two chimneys with a height of 120 meters,the delayed timing of the down cut relative to the upper cut was determined.By the set-up of buffering dams and bamboo barriers,touchdown vibration of the chimney was reduced,and the flying rocks and spattering substances were under control.Due to overlong delayed timing of the down cut,the down-sitting of the upper chimney section was for 4.39 seconds.

关键词(KeyWords): 烟囱;双向折叠;定向爆破;拆除爆破;安全措施
Chimney; Bidirectional folding; Directional blasting; Demolition blasting; Safety precautions

Abstract:

Keywords:

基金项目(Foundation):

作者(Authors): 郑炳旭,傅建秋,王永庆,唐涛,钟伟平
ZHENG Bing-xu~1,FU Jian-qiu~(1,2),WANG Yong-qing~1,TANG Tao~1,ZHONG Wei-ping~1(1.Hongda Blasting Engineering Co Ltd of Guangdong Province,Guangzhou 510055,China;2.University of Science and Technology Beijing,Beijing 100083,China)

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享