爆破拆除11层宿舍楼技术研究STUDY ON EXPLOSION TECHNOLOGY OF DEMOLISHING ELEVEN-FLOOR LIVING BUIUDING FOR STAFFS AND WORKERS
汤冶,杜卫华,张光宁,朱振海
Tang Ye(Xianqtan Mining Institute,Hunan 411201)Du Weihua;Zhang Guangning;Zhu Zhenhai(Mid-south P.A.D. Explosion Corp.Guangzhou,Guangzhou 510600)
摘要(Abstract):
本文论述了高层套筒式现浇钢筋混凝土框架建筑物的拆除爆破设计、施工方法;介绍了建筑物内剪力墙、电梯井、楼梯的有效预处理措施;同时对“大悬臂梁”、导爆管非电闭合网路起爆技术进行了探讨。
In this paper,the methods of blasting design and construction for demolishing the high buildings with sleevereinforced concrete frame structure are described.The pre-processing measures for inter-reinforced concrete wall,elevator well and stairs of the buildings before explosion are introduced.At the same time,the detonation technology of big cantilever beam and non-electric closed curcuit network of detonators is discussed.
关键词(KeyWords):
拆除爆破,大悬臂梁定向爆破,非电闭合网路起爆
Demolition blasting Controlled blasting of big cantilever beam Non-electric closed curcuit network of detonation
基金项目(Foundation):
作者(Authors):
汤冶,杜卫华,张光宁,朱振海
Tang Ye(Xianqtan Mining Institute,Hunan 411201)Du Weihua;Zhang Guangning;Zhu Zhenhai(Mid-south P.A.D. Explosion Corp.Guangzhou,Guangzhou 510600)
- 汤冶,杜卫华,张光宁,朱振海
Tang Ye(Xianqtan Mining Institute - Hunan 411201)Du Weihua
- Zhang Guangning
- Zhu Zhenhai(Mid-south P.A.D. Explosion Corp.Guangzhou
- Guangzhou 510600)
- 汤冶,杜卫华,张光宁,朱振海
Tang Ye(Xianqtan Mining Institute - Hunan 411201)Du Weihua
- Zhang Guangning
- Zhu Zhenhai(Mid-south P.A.D. Explosion Corp.Guangzhou
- Guangzhou 510600)