谟武水电站砼围堰控制爆破拆除CONTROLLED BLASTING CONSTRUCTION FOR CONCRETE DAM OF MOWU HYDROPOWER STATION
吴广忠,张武华
Wu Guangzhong Zhang Wuhua(Minjiang River Construction & Engineering Co;Fuzhou 350003);
摘要(Abstract):
通常采用控制爆破拆除砼围堰。本文介绍了谟武水电站砼围堰控制爆破拆除的经验,施工中解决了钻孔、装药、网路联接时出现的问题,爆破获得圆满成功,拆除砼6765m3。
The controlled blasting is generally used for demolishing concrete damThe demolition experience of concrete dam of Mowu Hydropower Station by controlled blasting is introduced in this paperThe problems occurred in drilling,charging,net connection in construction have been solvedThe demolition blasting of this concrete dam has got successTotally 6765m3 concrete has been demolished
关键词(KeyWords):
控制爆破,围堰拆除
Controlled blasting Dam removal
基金项目(Foundation):
作者(Authors):
吴广忠,张武华
Wu Guangzhong Zhang Wuhua(Minjiang River Construction & Engineering Co;Fuzhou 350003);