谟武水电站砼围堰控制爆破拆除
CONTROLLED BLASTING CONSTRUCTION FOR CONCRETE DAM OF MOWU HYDROPOWER STATION

吴广忠,张武华
Wu Guangzhong Zhang Wuhua(Minjiang River Construction & Engineering Co;Fuzhou 350003);

摘要(Abstract):

通常采用控制爆破拆除砼围堰。本文介绍了谟武水电站砼围堰控制爆破拆除的经验,施工中解决了钻孔、装药、网路联接时出现的问题,爆破获得圆满成功,拆除砼6765m3。
The controlled blasting is generally used for demolishing concrete damThe demolition experience of concrete dam of Mowu Hydropower Station by controlled blasting is introduced in this paperThe problems occurred in drilling,charging,net connection in construction have been solvedThe demolition blasting of this concrete dam has got successTotally 6765m3 concrete has been demolished

关键词(KeyWords): 控制爆破,围堰拆除
Controlled blasting Dam removal

Abstract:

Keywords:

基金项目(Foundation):

作者(Authors): 吴广忠,张武华
Wu Guangzhong Zhang Wuhua(Minjiang River Construction & Engineering Co;Fuzhou 350003);

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享