85m高的烟囱拆除爆破及其振动测试分析Blasting demolition and vibration measurement analysis of 85 m chimney
李阳;蒲传金;肖定军;李禹锡;李健钰;冯阳阳;
LI Yang;PU Chuan-jin;XIAO Ding-jun;LI Yu-xi;LI Jian-yu;FENG Yang-yang;Non-coal Mine Safety Technology Key Laboratory of Sichuan Province Colleges and Universities;School of Environment and Resources,Southwest University of Science and Technology;
摘要(Abstract):
为了验证爆破方案设计的合理性,介绍了广州油制气厂85m高钢筋混凝土烟囱的定向拆除爆破,同时分析了现场环境和影响倒塌的因素。在实施拆除爆破的设计方案时,沿烟囱倒塌方向前后、侧方及周围厂房布置共计11个测点,对此次拆除爆破进行全程振动监测。通过对实测振动信号和数据分析比较,发现在拆除爆破过程中,距离爆源较近处的爆破振动大于塌落触地振动;塌落触地振动强度不仅与振中距有关,而且测点方位对其也有着重要的影响;通过对测试数据拟合分析,发现减振沟和负高差地形能有效地降低振动强度。该研究为改进和优化拆除爆破方案,利用地形条件选择爆破倾倒方向,降低振动效应对周围环境影响具有一定的参考价值。
In order to verify the rationality of the blasting scheme design,the directional demolition blasting of the 85 mhigh reinforced concrete chimney in Guangzhou Oil Gas Plant was introduced.At the same time,the factors of field environment and collapse were analyzed.In the implementation of the demolition of the blasting of the design,along the chimney collapse before and after the direction of the side and the surrounding plant laid out 11 points and the demolition of the whole vibration was monitored.Through the comparison of the measured vibration signal and data,it was found that the blasting vibration at the distance from the blasting source was greater than that of the collapse and touchdown during the demolition blasting process.The vibration intensity of the collapsed touchdown was not only related to the vibration distance,but also had an important influence on it.Through the fitting analysis of the test data,it was found that the damping groove and the negative height difference terrain can effectively reduce the vibration intensity.This study had some reference value for improving and optimizing the demolition blasting scheme,using the terrain condition to select the blasting dumping direction and reduce the vibration effect on the surrounding environment.
关键词(KeyWords):
烟囱;爆破拆除;振动测试;爆破振动;塌落触地振动
chimney;demolition blasting;vibration measurement;blasting vibration;collapse touchdown vibration
基金项目(Foundation):
作者(Authors):
李阳;蒲传金;肖定军;李禹锡;李健钰;冯阳阳;
LI Yang;PU Chuan-jin;XIAO Ding-jun;LI Yu-xi;LI Jian-yu;FENG Yang-yang;Non-coal Mine Safety Technology Key Laboratory of Sichuan Province Colleges and Universities;School of Environment and Resources,Southwest University of Science and Technology;
参考文献(References):
- [1]杨人光,史家癱.建筑物爆破拆除[M].北京:中国建筑工业出版社,1985:100-116.YANG R G,SHI J Y.Blasting demolition of buildings[M].Beijing:China Architecture&Building Press,1985:100-116.
- [2]何华伟,王霞明,刘小春.定向爆破拆除烟囱[J].爆破,2004,21(1):44-46.HE H W,WANG M X,LIU X C.Demolition of a chimney by directional blasting[J].Blasting,2004,21(1):44-46.
- [3]黎丹清,俞城,汤月华,等.210m钢筋混凝土烟囱定向爆破拆除[J].工程爆破,2009,15(1):48-50,55.LI D Q,YU C,TANG Y H,et al.Demolition of a210m-high reinforced-concrete chimney by directional blasting[J].Engineering Blasting,2009,15(1):48-50,55.
- [4]刘殿中.工程爆破实用手册[M].北京:冶金工业出版社,2003:455-465.LIU D Z.Application manual ofengineering blasting[M].Beijng:Metallurgical Industry Press,2003:455-465.
- [5]国家安全生产监督管理总局.爆破安全规程:GB 6722-2014[S].北京:中国标准出版社,2015.State Administration of Work Safety.Safety regulations for blasting:GB 6722-2014[S].Beijing:China Standards Press,2015.
- [6]周家汉.爆破拆除塌落振动速度计算公式的讨论[J].工程爆破,2009,15(1):1-5.ZHOU J H.Discussion on calculation formula of collapsing vibration velocity caused by blasting demolition[J].Engineering Blasting,2009,15(1):1-5.
- [7]方向,高振儒,李的林,等.降低爆破震动效应的几种方法[J].爆破器材,2003,6(3):22-25.FANG X,GAO Z R,LI D L,et al.Several methods of reducing blasting vibration effects[J].Explosive Materials,2003,6(3):22-25.
- [8]朴志友,崔正荣,赵明生,等.120m砼烟囱爆破拆除振动测试与分析[J].爆破,2008,25(1):79-81.PIAO Z Y,ZUI Z R,ZHAO M S,et al.Monitoring and analysis ofimpact vibration caused by demolishing a120m-high chimney[J].Blasting,2008,25(1):79-81.
- [9]汪旭光.爆破设计与施工[M].北京:冶金工业出版社,2011:475-490.WANG G X.Design and construction of blasting[M].Beijng:Metallurgical Industry Press,2011:475-490.
- [10]王迪安.79m高烟囱拆除爆破振动与塌落触地振动对比分析[J].工程爆破,2006,12(1):86-89.WANG D A,Comparison between blasting vibration and touchdown vibration in demolishing collapse of a79m high chimney[J].Engineering Blasting 2006,12(1):86-89.
- 烟囱
- 爆破拆除
- 振动测试
- 爆破振动
- 塌落触地振动
chimney - demolition blasting
- vibration measurement
- blasting vibration
- collapse touchdown vibration
- 李阳
- 蒲传金
- 肖定军
- 李禹锡
- 李健钰
- 冯阳阳
LI Yang- PU Chuan-jin
- XIAO Ding-jun
- LI Yu-xi
- LI Jian-yu
- FENG Yang-yang
- Non-coal Mine Safety Technology Key Laboratory of Sichuan Province Colleges and Universities
- School of Environment and Resources
- Southwest University of Science and Technology
- 李阳
- 蒲传金
- 肖定军
- 李禹锡
- 李健钰
- 冯阳阳
LI Yang- PU Chuan-jin
- XIAO Ding-jun
- LI Yu-xi
- LI Jian-yu
- FENG Yang-yang
- Non-coal Mine Safety Technology Key Laboratory of Sichuan Province Colleges and Universities
- School of Environment and Resources
- Southwest University of Science and Technology