150m高钢筋混凝土烟囱定向爆破拆除Blasting demolition of 150m high reinforced concrete chimney
李鸿,陈信鸿,李杰
LI Hong,CHEN Xin-hong,LI Jie
摘要(Abstract):
介绍了成功将150m钢筋混凝土烟囱进行爆破拆除的案例。针对待爆破烟囱周围环境特点制定了爆破设计方案,采用了加大爆破切口高度,全部瞬发起爆及簇联复式网路以及安全防护措施。烟囱倒塌长度165.3m,倒塌方向前冲距离约为烟囱高度的10%,在爆破以及烟囱下坐、倒塌触地过程中振动速度最大值为0.10cm/s,需保护建(构)筑物和设施完好无损。取得了定向准确、倾倒落地安全、爆破振动控制好的经验,可为类似爆破工程提供参考。
The blasting of 150 mreinforced concrete chimmey successfully was introduced.The blasting design was made according to the environmental characteristics of the chimney.The height of blasting cut was increased,and all instantaneous detonation and cluster compound network and safety protection measures were used.The collapse length of the chimney was165.3m,the collapsed distance along the collapse direction was 1/10 of the chimney height.Under the blasting,the peak velocity of the collapsed vibration was 0.10cm/s,and the protection of the building/structures and facilities were in good condition.This blasting made orientation accurately,the experience of dumping ground safety and the controlling of good blasting vibration had been obtained,which could provide a reference for similar blasting engineerings.
关键词(KeyWords):
烟囱;钢筋混凝土;定向爆破;爆破拆除;安全措施;爆破振动
Chimney;Reinforced concrete;Directional blasting;Blasting demolition;Security measure;Blasting vibration
基金项目(Foundation): 黔科合重大专项字[2015]6003;; 黔科合高G字[2015]4004;; 贵州省工业和信息化发展专项基金计划(2015030)
作者(Author):
李鸿,陈信鸿,李杰
LI Hong,CHEN Xin-hong,LI Jie
参考文献(References):
- [1]汪旭光,于亚伦.拆除爆破理论与工程实例[M].北京:人民交通出版社,2008:124-138.WANG Xu-guang,YU Ya-lun.Demolition blasting theory and engineering example[M].Beijing:China Communication Press,2008:124-138.
- [2]谢先启.150m钢筋砼烟囱爆破拆除技术与分析[J].工程爆破,2008,14(1):54-56.XIE Xian-qi.Technology and analysis of 150m reinforced concrete chimney blasting demolition[J].Engineering Blasting,2008,14(1):54-56.
- [3]卢子冬,张世平,张昌锁.永济市热电厂150m烟囱爆破拆除[J].工程爆破,2015,21(1):33-36.LU Zi-dong,ZHANG Shi-ping,ZHANG Chang-suo.150m chimney blasting demolition of Yongji thermal power plant[J].Engineering Blasting,2015,21(1):33-36.
- [4]夏卫国,武双章,唐勇.新海电厂210m高钢筋混凝土烟囱爆破拆除[J].工程爆破,2011,17(1):58-60.XIA Wei-guo,WU Shuang-zhang,TANG Yong.210m reinforced concrete chimney by blasting demolition of Xinhai power plant[J].Engineering Blasting,2011,17(1):58-60.
- [5]朴志友,崔正荣,赵明生,等.120m砼烟囱拆除振动测试与分析[J].爆破,2008,25(1):79-81.PU Zhi-you,CUI Zheng-rong,ZHAO Ming-sheng,et al.Test and analysis of vibration of 120m concrete chimney[J].Blasting,2008,25(1):79-81.
- [6]王兴雁,张可玉,周方毅.黄岛热电厂152.8m高烟囱拆除爆破振动测试[J].工程爆破,2007,13(1):59-61.WANG Xing-yan,ZHANG Ke-yu,ZHOU Fang-yi.Blasting vibration test of 152.8mhigh chimney demolition blasting in Huangdao thermal power plant[J].Engineering Blasting,2007,13(1):59-61.
- [7]爆破安全规程GB 6722-2014[S].北京:中国标准出版社,2014.Safety regulations for blasting GB 6722-2014[S].Beijing:Standards Press of China,2014.