工程爆破

2010, v.16;No.61(03) 75-77

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

电解铝厂120m高烟囱及旧厂房拆除爆破
DEMOLITION OF A 120M-HIGH CHIMNEY AND OLD PLANT OF ALUMINUM SMELTER FACTORY BY CONTROLLED BLASTING

王东平,马克,卢超波
WANG Dong-ping,MA Ke,LU Chao-bo(College of Resources and metallurgy

摘要(Abstract):

介绍了电解铝厂120m高钢筋混凝土烟囱及旧厂房定向倒塌爆破拆除的情况。针对烟囱高度大、环境复杂及旧厂房大跨度的特点,对爆破方案进行了精心设计;经过计算选取合理的爆破切口及定向窗的范围;采用延时控制爆破技术,同时对烟囱及旧厂房进行爆破拆除。通过安全校核,确保了附近厂房的安全。
A 120m-high reinforced concrete chimney and the old factory of a aluminum smelter factory were collapsed by directional blasting demolition.With the huge height and complex surroundings of chimney and the big span of the old plant,the blasting programme was carefully designed and the reasonable gap and scope of directional window were selected by calculation.Chimney and the old plant were demolished by millisecond control blasting technology.The security checking was adopted to ensure the safety of a nearby plant.

关键词(KeyWords): 烟囱;旧厂房;控制爆破;定向窗;安全校核
Chimney;Old plant;Controlled blasting;Directional windows;Security checking

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 王东平,马克,卢超波
WANG Dong-ping,MA Ke,LU Chao-bo(College of Resources and metallurgy

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享