工程爆破

2010, v.16;No.59(01) 59-62

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

69.8m高冷却塔定向爆破拆除
DIRECTIONAL BLASTING DEMOLITION OF A 69.8M HIGH COOLING TOWER

贾永胜,谢先启,罗启军,韩传伟,程良奎,刘昌邦
JIA Yong-sheng1,2,XIE Xian-qi2,LUO Qi-jun2,HAN Chuan-wei2,CHENG Liang-kui2

摘要(Abstract):

介绍了一座双曲线钢筋混凝土筒式结构冷却塔的定向爆破拆除。阐述了冷却塔结构特点、爆破难点、总体拆除方案、设计参数的选择及飞石防护措施等。爆破取得预期效果,可为同类工程提供参考。
There was a detail introduction of directional demolition blasting of a hyperbolic reinforced concrete cooling tower with core structure.Structural features of cooling towers,main points and difficult points of blasting work,overall demolition program,the choice of blasting parameters and flyrock protection were related.Desired effects were made and the project was available for similar projects.

关键词(KeyWords): 拆除爆破;筒式结构;冷却塔;飞石防护
Demolition blasting;Core structure;Cooling tower;Flyrock protection

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 贾永胜,谢先启,罗启军,韩传伟,程良奎,刘昌邦
JIA Yong-sheng1,2,XIE Xian-qi2,LUO Qi-jun2,HAN Chuan-wei2,CHENG Liang-kui2

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享