100m高钢筋混凝土烟囱定向爆破拆除DIRECTIONAL BLASTING DEMOLITION OF A 100-METER-HIGH REINFORCED CONCRETE CHIMNEY
毕卫国,王超,李媛媛,李文涛,孙明旭
BI Wei-guo,WANG Chao,LI Yuan-yuan,LI Wen-tao,SUN Ming-xu
摘要(Abstract):
采用定向控制爆破技术成功拆除了100m高钢筋混凝土烟囱。预先用爆破法开设定向窗和减荷槽,在保证余留截面稳定性的前提下对切口范围内的支撑体实施爆破,使烟囱按预定方向倒塌。爆破效果表明,松软农田有利于减小烟囱前冲、降低触地振动,可为同类工程提供借鉴。
A 100mreinforced concrete chimney was demolished successfully by directional blasting technique.In order to make the chimney collapsed according to the designed direction,the directional windows and load reducing groove were pretreated and then the supporting body within the range of cut was blasted based on the stability of remaining sections was insured.The blasting effect showed that the soft farmland was helpful to reduce forward rush and touchdown vibration of the chimney.It could provide a reference for similar projects.
关键词(KeyWords):
钢筋混凝土烟囱;爆破拆除;定向爆破;前冲;触地振动
Reinforced concrete chimney;Blasting demolition;Directional blasting;Forward rush;Touchdown vibration
基金项目(Foundation):
作者(Author):
毕卫国,王超,李媛媛,李文涛,孙明旭
BI Wei-guo,WANG Chao,LI Yuan-yuan,LI Wen-tao,SUN Ming-xu
参考文献(References):
- [1]刘强,高振儒.烟囱定向爆破拆除的预处理方法[J].爆破,2001,18(3):47-49.
- [2]陈国良,郭承.广西浦北县80m高钢筋混凝土烟囱爆破拆除[J].爆破,2007,24(4):55-57.
- [3]谢先启.150m钢筋砼烟囱爆破拆除技术与分析[J].工程爆破,2008,14(1):54-56.
- [4]潘常洪,鹿智勇.鞍钢第二发电厂120m钢筋混凝土烟囱爆破拆除[J].工程爆破,2002,8(2):20-22.
- [5]付武,王永强,蒋金玉,等.120m高钢筋混凝土烟囱爆破拆除[J].工程爆破,2006,12(4):35-37.
- [6]王绍鹏.土体动弹性模量与动剪切模量关系对比研究[D].大连:大连理工大学,2009.
- [7]李福清,王祺,马宏昊,等.爆破振动在混凝土与软土结构中传播差异性研究[J].工程爆破,2010,16(4):18-21.
- 钢筋混凝土烟囱
- 爆破拆除
- 定向爆破
- 前冲
- 触地振动
Reinforced concrete chimney - Blasting demolition
- Directional blasting
- Forward rush
- Touchdown vibration