工程爆破

2005, (02) 34-36

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Past Issue) | 高级检索(Advanced Search)

露天煤矿预裂爆破的设计施工与评价
DESIGN & CONSTRUCTION AND EVALUATION OF PRESPLITTING BLASTING

常永刚,贺昌斌,乔殿宏,王骞
CANG Yong-gang,HE Chang-bin,QIAO Dian-hong,WANG Qian (Pingshuo Anjialing Open-Pit Mine Co.Ltd.,Shuozhou 036006,Shanxi,China)

摘要(Abstract):

露天矿生产要求通过预裂爆破保护到界边坡岩石的完整性和稳定性,安家岭煤矿长期以来进行此项工作效果并不明显。为此组织相关技术人员对预裂爆破重新设计、优化施工并进行试验与评价,提高了爆破效果与质量。本文对成功经验进行总结,供同类矿山企业技术参考。
Production in open-pit mine requires to protect the integrality and stability of the rock in the circle of the slope through presplitting blasting.The presplitting blasting was performed in the production in Anjialing Mine,but no obvious positive results reached in the past.For this reason,the work of redesign the presplitting blasting was carried out by relevant technical staffs.The new design was tested with optimized construction scheme and the blasting test was evaluated.Tests showed that the new design upgraded the blasting quality and effect.The present paper summarizes the successful experience accumulated in the production and likes to share the technical success with other Mine of the kind.

关键词(KeyWords): 露天煤矿;预裂爆破;边坡稳定;分析评价
Open coal mine; Presplitting blasting; Slope stability; Evaluation

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 常永刚,贺昌斌,乔殿宏,王骞
CANG Yong-gang,HE Chang-bin,QIAO Dian-hong,WANG Qian (Pingshuo Anjialing Open-Pit Mine Co.Ltd.,Shuozhou 036006,Shanxi,China)

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享