工程爆破

2012, v.18;No.69(03) 51-53

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Past Issue) | 高级检索(Advanced Search)

点柱式微拱形光面爆破采矿技术的研究与实践
RESEARCH AND PRACTICE ON THE DOTTED PILLAR METHOD MICRO ARCHED SMOOTH BLASTING MINING TECHNOLOGY

陈赞成;刘钦;何顺斌;李威;
CHEN Zan-cheng~(1,3),LIU Qin~(2,3),HE Shun-bin~2,LI Wei~2 (1.Beijing General Research Institute of Mining and Metallurgy,Beijing 100160,China; 2.Sanshandao Gold Mine,Shandong Gold Group,Laizhou 261442,Shandong,China; 3.School of Civil and Environmental Engineering,University of Science and technology Beijing,Beijing 100083,China)

摘要(Abstract):

三山岛金矿将点柱式微拱形光面爆破技术运用于井下采场回采,减小了爆破对采场预控顶板的破坏,从而保证采场顶板的稳定。点柱式微拱形光面爆破采矿技术不仅达到安全回采的目的,而且取得了较好的经济效益,通过实践证明该方法在采场控顶方面具有较强的可操作性和实用性。
At Sanshandao gold deposit,the pointed pillar micro arched smooth blasting technology was used in underground stope to reduce the roof damage caused by blasting so as to ensure the stability of the stope roof.This technology not only reached the purpose of safe mining,but also achieved good economic benefits.The practice of the project has demonstrated that the technology is operational and practical in controlling the damage of the stope roof.

关键词(KeyWords): 微拱形顶板;光面爆破;顶板控制和支护
Micro arched roof;Smooth blasting;Control and support of the roof

Abstract:

Keywords:

基金项目(Foundation):

作者(Authors): 陈赞成;刘钦;何顺斌;李威;
CHEN Zan-cheng~(1,3),LIU Qin~(2,3),HE Shun-bin~2,LI Wei~2 (1.Beijing General Research Institute of Mining and Metallurgy,Beijing 100160,China; 2.Sanshandao Gold Mine,Shandong Gold Group,Laizhou 261442,Shandong,China; 3.School of Civil and Environmental Engineering,University of Science and technology Beijing,Beijing 100083,China)

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享