复杂环境下低层框架结构楼房拆除爆破Demolition blasting of low-rise frame structure building in complex environment
王贵;王渊;孙国利;马保才;魏正;
WANG Gui;WANG Yuan;SUN Guo-li;MA Bao-cai;WEI Zheng;Inner Mongolia Knergy Blasting Co.,Ltd.;
摘要(Abstract):
画舫建筑为钢筋混凝土框架结构楼房,位于乌兰木伦湖景区的河道水面上。汛期来临,为保证河道畅通,鄂尔多斯市政府决定对其予以拆除。综合施工环境、楼房结构特征等情况,提出了定向倒塌、单向折叠、三角形切口的拆除爆破方案。采用可靠的爆破参数设计、合理的预处理、复式的起爆网路,成功地拆除了画舫建筑。爆后检查,楼房解体和破碎较为充分,同时爆破振动监测数据表明未对周边建筑物造成危害,取得了良好的爆破效果。画舫建筑的成功拆除对类似复杂环境下低层框架结构楼房拆除具有一定的工程借鉴意义。
The painted pleasure-boat building is a reinforced concrete frame structure building, located on the surface of the river in the Wulan Mulun Lake Scenic Area. The flood season is approaching, in order to ensure the smooth flow of the river, the Ordos Municipal Government decided to demolish it. Considering the construction environment and building structure characteristics, a demolition blasting plan of directional collapse, one-way folding and triangular incision is proposed. Adopting reliable blasting parameter design, reasonable pretreatment, and duplex blasting network, the painting boat building was successfully demolished. After the explosion, the disintegration and fragmentation of the building were relatively sufficient. At the same time, the blasting vibration monitoring data showed that no damage was caused to the surrounding buildings, and good blasting results were obtained. The successful demolition of the building has certain engineering reference significance for the demolition of low-rise frame structure buildings in similar complex environments.
关键词(KeyWords):
复杂环境;拆除爆破;框架结构;爆破振动
complex environment;demolition blasting;frame structure;blasting vibration
基金项目(Foundation):
作者(Authors):
王贵;王渊;孙国利;马保才;魏正;
WANG Gui;WANG Yuan;SUN Guo-li;MA Bao-cai;WEI Zheng;Inner Mongolia Knergy Blasting Co.,Ltd.;
DOI: 10.19931/j.EB.20210024
参考文献(References):
- [1] 董保立,张纪云,王晓,等.复杂环境下12层框剪结构楼房爆破拆除[J].工程爆破,2017,23(2):58-61.DONG B L,ZHANG J Y,WANG X,et al.Blasting demolition of 12-story frame shear structure building in complicated environment[J].Engineering Blasting,2017,23(2):58-61.
- [2] 谢钱斌.内部结构复杂的高层楼房拆除爆破[J].工程爆破,2019,25(5):57-62.XIE Q B.Demolition blasting of high-storey buildings with complex internal structure [J].Engineering Blasting,2019,25(5):57-62.
- [3] 汪旭光.爆破设计与施工[M].北京:冶金工业出版社,2011.WANG X G.The blasting design and construction [M].Beijing;Metallurgical Industry Press,2011.
- [4] 顾毅成,史雅语,金骥良.工程爆破安全[M].合肥:中国科学技术大学出版社,2009.GU Y C,SHI Y Y,JIN J L.Engineering blasting safety[M].Hefei:China University of Science and Technology Press,2009.
- [5] 国家安全生产监督管理总局.爆破安全规程:GB 6722-2014[S].北京:中国标准出版社,2015.State Administration of Work Safety.Safety regulations for blasting:GB 6722-2014[S].Beijing:China Standards Press,2015.
- [6] 汪旭光.爆破手册[M].北京:冶金工业出版社,2010.W X G.Handbook of blasting[M].Beijing:Metallurgical Industry Press,2010.
- [7] 田水龙,张程娇,黄雄,等.8层框架结构楼房爆破拆除后坐数值模拟[J].工程爆破,2019,25(1):13-18.TIAN S L,ZHANG C J,HUANG X,et al.Numerical simulation of backward collapse in blasting demolition of8-storey frame building[J].Engineering Blasting,2019,25(1):13-18.
- [8] 王铁,刘伟,李洪伟.小高宽比框架结构建筑物拆除爆破数值模拟分析[J].现代矿业,2015,(6):149-150.WANG T,LIU W,LI H W.Numerical simulation analysis of demolition blasting of small high-wide-ratio frame structure buildings[J].Modern Mining,2015(6):149-150.
- [9] 张明,刘军,贾永胜,等.切口方式与延期时差对框架结构爆破拆除效果的影响[J].爆破,2017,34(2):1-8.ZHANG M,LIU J,JIA Y S,et al.Influence of cut pattern and delay time difference on effect of frame structure explosive demolition[J].Blasting,2017,34(2):1-8.
- [10] 程涛,孟繁树,田园,等.闹市区框剪结构楼房爆破拆除与有害效应控制[J].工程爆破,2018,24(6):65-69.CHENG T,MENG F S,TIAN Y,et al.Blasting demolition and harmful effect control of frame shear wall structure in downtown area[J].Engineering Blasting,2018,24(6):65-69.