改扩建隧道掘进爆破与振动监测
THE EXCAVATION AND BLASTING VIBRATION MONITORING OF THE RECONSTRUCTION AND EXTENSION PROJECT OF TUNNEL

尧少敏,陈克大,刘冬,叶春琳,高文学,石连松
YAO Shao-min,CHEN Ke-da,LIU Dong,YE Chun-lin,GAO Wen-xue,SHI Lian-song

摘要(Abstract):

基于东长峪隧道改扩建工程,研究了在不同临空面条件下改扩建隧道的爆破开挖技术。选取拱顶空洞段为典型断面,对其光面爆破参数进行了合理设计,同时在既有隧道拱底两侧(掌子面前方)布置测点进行振动监测,分析了既有隧道内爆破振动波的特点及其传播规律,为隧道爆破参数的优化和空洞区支护方式的选取提供了依据,研究结果可为类似隧道工程施工提供参考。
Based on the reconstruction and extension project of Dong Chang-yu tunnel,the tunnel blasting technique on the condition of multi-free face was studied.The cavity collapse segment was selected as the typical cross-section and the smooth blasting parameters were designed resonably.Characteristics and propagation laws of blasting vibration wave in the existing tunnel were analyzed by means of monitoring the blasting vibration features on both sides of the existing tunnel arch bottom(before the tunnel face),thus provided a basis for adjusting the blasting parameters dynamically and selecting the proper support pattern for the cavity collapse segment.This successful blasting experience could provide a reference for the blasting operation in the similar renovation and expansion project of tunnel.

关键词(KeyWords): 改扩建隧道;掘进爆破;振动监测;传播规律
Reconstruction and extension project of tunnel;Blasting of excavation;Blasting vibration monitoring;Propagation law

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 尧少敏,陈克大,刘冬,叶春琳,高文学,石连松
YAO Shao-min,CHEN Ke-da,LIU Dong,YE Chun-lin,GAO Wen-xue,SHI Lian-song

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享