摘要(Abstract):
不同切口方式与延时时差对建筑物拆除爆破倒塌效果有着极大影响,尤其是对大高宽比的框架剪力墙结构的建筑物拆除爆破倒塌效果影响更大。因此,利用数值模拟对建筑物倒塌效果进行仿真分析。以17层框架剪力墙结构拆除爆破工程为例,利用ANSYS/LS-DYNA有限元分析软件,采用整体式模型,对不同切口方式和延时时差的框架剪力墙结构倒塌过程进行数值模拟。对框剪结构分别采用三角形和梯形切口,以及切口处中间排立柱同时起爆和延时起爆,共选取5种组合方案进行结构倒塌的对比分析。结果表明:采用三角形切口时,中间排立柱同时起爆,最后排立柱容易被压屈,形成的偏心弯矩比第二爆破区段只爆破底层立柱偏小;采用梯形切口时,在切口全部形成后,结构倒塌过程中,梯形切口以上部分形成附加的偏心弯矩较三角形切口小,切口触地时前倾速度比三角形切口小。
In blasting demolition,the form of blasting notch and the difference of time delay do have an essential influence on the collapse effect of structures,especially for frame-shear structures with large height-to-width ratio.Therefore,simulation analysis of building collapse effect by the numerical simulation.Numerical simulation in this paper is based on a demolition blasting example of a 17-layer frame-shear structure.The work is carried on by using ANSYS/DYNA software.And integrated model is adopted to simulate the collapse processes of a frame-shear structure with different blasting notch and time delay.The notch is either in the shape of triangle or trapezoid.Explosions of the columns in the middle row are triggered simultaneously or separately with a certain time delay.In this way,five kinds of combination are secured to carry out the numerical simulation.The results show that on the condition of the cut shaping like a triangle and explosions of the columns in the middle triggered simultaneously,supporting columns in the back row are easily stressed to yield,generating an eccentric moment smaller than that generated on the condition of merely the bottom of the columns in the middle beingexploded.In contrast,if trapezoidal notch is adopted,and soon after the notch is totally formed,an extra eccentric moment is generated in the part above which is smaller that generated by triangle notch.Furthermore,the forward speed is also smaller compared with that on the other condition.
关键词(KeyWords):
框剪结构;切口方式;延时时差;拆除爆破;数值模拟
frame-shear structure;form of blasting notch;time delay;blasting demolition;numerical simulation
基金项目(Foundation): 国家自然科学基金资助项目(51174076)
作者(Authors):
张超;张明;刘军;刘明清;蓝鹏;
ZHANG Chao;ZHANG Ming;LIU Jun;LIU Ming-qing;LAN Peng;College of Civil and Transportation Engineering,HoHai University;Key Laboratory of Ministry of Education for Geo-mechanics and Embankment Engineering;Chengdu JZFZ Architecture Design Company;
参考文献(References):
- [1]贾永胜,谢先启,姚颖康,等.高层建筑物折叠爆破拆除关键技术参数探讨[J].爆破,2016,33(3):75-80.JIA Y S,XIE X Q,YAO Y K,et al.Discussed on key parameters of folding explosive demolition of high-rise building[J].Blasting,2016,33(3):75-80.
- [2]言志信,刘培林,叶振辉.框架剪力墙结构的定向爆破倒塌过程[J].爆炸与冲击,2011,31(6):647-652.YAN Z X,LIU P L,YE Z H.Directional blasting collapse process of frame-shear wall structure[J].Explosion and Shock Waves,2011,31(6):647-652.
- [3]李清,杨阳,杨仁树,等.基于MAT96本构模型的钢筋混凝土结构爆破拆除数值模拟[J].爆破器材,2015,44(1):41-45.LI Q,YANG Y,YANG R S,et al.The numerical simulation of reinforced concrete structure blasting based on MAT96constitutive model[J].Explosive Materials,2015,44(1):41-45.
- [4]谢先启,贾永胜,黄小武.17层框-剪结构大楼定向爆破拆除[J].爆破,2016,33(2):107-112.XIE X Q,JIA Y S,HUANG X W.Directional explosive demolition of a 17-layer frame-shear structure building[J].Blasting,2016,33(2):107-112.
- [5]杨军,杨国栋,张光雄.建筑结构爆破拆除数值模拟[M].北京:科学出版社,2012:50-78.YANG J,YANG G D,ZHANG G X.Numerical simulation on blasting demolition for architectural structures[M].Beijing:Science Press,2012.
- [6]谢先启,刘军,贾永胜,等.拆除爆破数值模拟研究进展[J].中国工程科学,2014,16(11):20-27.XIE X Q,LIU J,JIA Y S,et al.Advances in numerical simulation of demolition blasting[J].Engineering Sciences,2014,16(11):20-27.
- [7]SHI G H.Block system modeling by discontinuous deformation analysis[C]//American Rock Mechanics Association.25th US Symposium on Rock Mechanics.Evanston.25Jun.1984:790-799.
- [8]MEGURO K,TAGLE D H.AEM used for large displacement structure analysis[J].Journal of Natural Disaster Science,2002,24(2):65-82.
- [9]LI T,HAO W.Numerical analysis for progressive collapse of a multi-story building due to an explosion in its basement[J].Advanced Materials Research,2012,228(1):1 034-1 038.
- [10]CHUN M X,TIE J T,EN A C,et al.Numerical simulation of frame structure blasting demolition under explosive loading[J].Applied Mechanics and Materials,2014,533:164-169.
- [11]MATTERN S,BLANKENHORN G,SCHWEIZERHOF K.Computer-aided destruction of complex structures by blasting[C]//WOLFGANG E N,DIETMAR B K,MICHAEL M R.High Performance Computing in Science and Engineering.Springer Berlin Heidelberg,2007:449-457.
- [13]杨运洲,杨学山,赵青林.7层框剪结构大楼的爆破拆除[J].工程爆破,2002,8(4):52-55.YANG Y Z,YANG X S,ZHAO Q L.Explosive demolition of a 7-layer frame-shear structure[J].Engineering Blasting,2002,8(4):52-55.
- [14]贾永胜.大型结构拆除爆破倒塌过程的连续仿真[D].武汉:武汉理工大学,2010:32-38.JIA Y S.Continuous simulation of collapse process of blasting demolition for large structures[D].Wuhan:Wuhan University of Technology,2010:32-38.
- [15]尚晓江,苏建宇.ANSYS/LS-DYNA动力分析方法与工程实例[M].北京:中国水利水电出版社,2006:15-18.SHANG X J,SU J Y.ANSYS/LS-DYNA dynamic analysis method and engineering examples[M].Beijing:China Water&Power Press,2006:15-18.
- 框剪结构
- 切口方式
- 延时时差
- 拆除爆破
- 数值模拟
frame-shear structure - form of blasting notch
- time delay
- blasting demolition
- numerical simulation
- 张超
- 张明
- 刘军
- 刘明清
- 蓝鹏
ZHANG Chao- ZHANG Ming
- LIU Jun
- LIU Ming-qing
- LAN Peng
- College of Civil and Transportation Engineering
- HoHai University
- Key Laboratory of Ministry of Education for Geo-mechanics and Embankment Engineering
- Chengdu JZFZ Architecture Design Company
- 张超
- 张明
- 刘军
- 刘明清
- 蓝鹏
ZHANG Chao- ZHANG Ming
- LIU Jun
- LIU Ming-qing
- LAN Peng
- College of Civil and Transportation Engineering
- HoHai University
- Key Laboratory of Ministry of Education for Geo-mechanics and Embankment Engineering
- Chengdu JZFZ Architecture Design Company