炼铁高炉炉衬爆破拆除
BLASTING DEMOLITION OF FURNACE LINER OF IRON-REFINING BLASTING-FURNACE

潘常洪,鹿智勇
Pan Changhong; Lu Zhiyong(Building Co. of Anshan Steel General Co., Anshan 114021)

摘要(Abstract):

介绍鞍钢炼铁厂11#高炉大修工程中爆破拆除高炉炉衬的过程.采用爆破方法先破坏炉衬环型砌体结构,再爆破冷却壁之上衬砖,使村砖局部悬空,在重力作用下脱落,达到安全、快速拆除衬砖的目的。
This paper introduces the blasting demolition process of furnace liner during theoverhaul engineering of blasting-furnace No.ll of an iron refinery of Anshan Steel GeneralPlant. FAstly the circle building structure of fUrnace liner was damaged with the method ofblasting. Secondly the lining bricks in freezing wall were damaged so that the lining bricks werehanging sectionally and dropped with the gravity. The intent of safely and speedily demolishingliner bricks was attained.

关键词(KeyWords): 拆除爆破;环型砌体结构破坏;局部悬空;脱落
Blasting demolition; Damaging of the circle building structure;Hanging sectionally; Dropping

Abstract:

Keywords:

基金项目(Foundation):

作者(Authors): 潘常洪,鹿智勇
Pan Changhong; Lu Zhiyong(Building Co. of Anshan Steel General Co., Anshan 114021)

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享