100m钢筋砼烟囱爆破拆除
BLASTING DEMOLITION OF A 100M REINFORCED CONCRETE CHIMNEY

谢先启;刘昌邦;贾永胜;罗启军;韩传伟;
XIE Xian-qi1,LIU Chang-bang1,JIA Yong-sheng 1,2,LUO Qi-jun1,HAN Chuan-wei1(1.WuHan Blasting Engineering Company,Wuhan 430023,China;2.School of Resource and Environment Engineering,Wuhan University of Technology,Wuhan 430070,China)

摘要(Abstract):

介绍了1座100m高钢筋砼烟囱的爆破拆除。根据环境与结构特征,烟囱倾倒方向采用沿烟囱烟道口中轴线向北偏转20°的定向爆破拆除施工方案。为同类工程拆除提供一定的经验借鉴。
The blasting demolition of a 100m high reinforced concrete chimney was introduced.Based on the environmental and structural characteristics,the blasting construction adopted the directional blasting demolition of 20 degrees northward along the central axis of the chimney flue.Similar projects could get some experience from this paper.

关键词(KeyWords): 钢筋砼;烟囱;爆破拆除
Reinforced concrete;Chimney;Blasting demolition

Abstract:

Keywords:

基金项目(Foundation):

作者(Authors): 谢先启;刘昌邦;贾永胜;罗启军;韩传伟;
XIE Xian-qi1,LIU Chang-bang1,JIA Yong-sheng 1,2,LUO Qi-jun1,HAN Chuan-wei1(1.WuHan Blasting Engineering Company,Wuhan 430023,China;2.School of Resource and Environment Engineering,Wuhan University of Technology,Wuhan 430070,China)

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享