摘要(Abstract):
为了降低紧邻建筑物的深层隧道爆破振动峰值,运用电子雷管进行了多次爆破振动实验。选取3个典型的上台阶爆破振动波形进行了分析,在设置孔间或排间延时间隔时,不仅要考虑振动波从爆源到测点的传播时间,还要考虑因地质的不均匀性而吸收振动能量并在软硬交界面反射到测点形成振动值更大的波峰波谷。运用错峰减振原理,考虑单孔爆破振动波传播时间及主振周期及反射波主振周期,多次进行孔间及排间分组组合实验,得到掏槽孔和扩槽孔间延时间隔时间为712ms时,能使后续反射振动波形错峰减振到最小,且孔间及排间延时时间不宜过大,尤其是掏槽孔及扩槽孔间延时间隔时间较小时,减振效果较好。
In order to reduce the blasting vibration peaks of deep tunnels close to the buildings,blasting vibration experiments were carried out several times using electronic detonators.Three typical upper step blasting vibration waveforms were selected for analysis.When setting the delay time between holes or rows,not only consider the spread time of the vibration wave from the explosion source to the measurement point,but also consider a large vibration value of crest and wave velley because of the geology inhomogeneities that absorbing vibration energy and reflected at the soft and hard interface to the measuring point.Using the peak shift reduce vibration principles,considering the single-hole blasting vibration wave spread time and the main oscillation period and the main period of the reflected wave,multiple combinations of holes and row grouping tests,the delay interval between the cutting shot and the wall hole is 7—12 ms,it can minimize the vibration of the subsequent reflection vibration waveform,and the delay time between the holes and between the rows should not be too large,especially when the delay time between the cutting shot and the wall holes is small,the effect is better of reduce vibration.
关键词(KeyWords):
深层隧道;传播时间;反射波;延时间隔时间;干扰错峰降振;电子雷管
deep tunnel;spread time;reflected wave;delay interval time;reduce vibration of interference peak shifting;electronic detonators
基金项目(Foundation):
作者(Authors):
郭华杰;付天杰;刘世波;龚罡;顾春光;
GUO Hua-jie;FU Tian-jie;LIU Shi-bo;GONG Gang;GU Chun-guang;Shenzhen City and the Advantage of Blasting Engineering Co.,Ltd.;China Academy of Railway Sciences;
参考文献(References):
- [1]尧少敏,陈克大,刘冬,等.改扩建隧道掘进爆破与振动监测[J].工程爆破,2014,20(5):37-40.YAO S M,CHEN K D,LIU D,et al.The excavation and blasting vibration monitoring of the reconstruction and extension project of tunnel[J].Engineering Blasting,2014,20(5):37-40.
- [2]龙源,李兴华,赵华兵,等.隧道爆破振动对相邻既有平行隧道影响分析[C]//汪旭光.中国爆破新进展.北京:冶金工业出版社,2014:113-123.LONG Y,LI X H,ZHAO H B,et al.Research on vibration effects on existing parallel tunnel induced by blassing of an adjacent tunnel[C]//WANG X G.New progress of blasting in China.Beijing:Metallurgical Industry Press,2014:113-123.
- [3]邹新宽,张继春,潘强,等.隧道明挖段拉槽爆破时既有隧道结构动力响应特性[J].振动与冲击,2015,34(19):203-207.ZOU X K,ZHANG J C,PAN Q,et al.Dynamic response characteristics of an existing tunnel structure under cutting blast utilized in open excavation[J].Journal of Vibration and Shock,2015,34(19):203-207.
- [4]许建聪,简文彬,尚岳全,等,地脉动在福州市区地基土层场地评价中有应用[J].岩石力学与工程学报,2004,23(17):3 014-3 020.XU J C,JIAN W B,SHANG Y Q,et al.Application of microtremor to site evaluation in Fuzhou[J].Chinese Joural of Rock Mechanics and Engineering,2004,23(17):3 014-3 020.
- [5]杨年华.爆破振动理论与测控技术[M].北京:中国铁道出版社,2014:71-137.YANG N H.The blasting vibration theory and control technology[M].Beijing:China Railway Publishing House,2014:71-137.
- [6]国家安全生产监督管理总局.爆破安全规程:GB6722-2014[S].北京:中国标准出版社,2015.State Administration of Work Safety.Safety regulations for blasting:GB 6722-2014[S].Beijing:China Standards Press,2015.
- 深层隧道
- 传播时间
- 反射波
- 延时间隔时间
- 干扰错峰降振
- 电子雷管
deep tunnel - spread time
- reflected wave
- delay interval time
- reduce vibration of interference peak shifting
- electronic detonators
- 郭华杰
- 付天杰
- 刘世波
- 龚罡
- 顾春光
GUO Hua-jie- FU Tian-jie
- LIU Shi-bo
- GONG Gang
- GU Chun-guang
- Shenzhen City and the Advantage of Blasting Engineering Co.
- Ltd.
- China Academy of Railway Sciences
- 郭华杰
- 付天杰
- 刘世波
- 龚罡
- 顾春光
GUO Hua-jie- FU Tian-jie
- LIU Shi-bo
- GONG Gang
- GU Chun-guang
- Shenzhen City and the Advantage of Blasting Engineering Co.
- Ltd.
- China Academy of Railway Sciences