输煤线栈台水压爆破拆除
WATERPRESSURE BLASTING DEMOLITIONOF COAL LOADINGTRUGH IN POWER PLANT

李伟,刘先魁,林素彬
Li Wei Liu Xiankui(Yellow River Engineering Technical Development Co;Zhengzhou 450003)Lin Subin(Shenzhen Water Resources Bureau;Guangdong 518122);

摘要(Abstract):

某热电厂输煤线环境复杂,周围建筑物多、距离近,厂方要求拆除时输煤线不停产、不破坏建筑物、爆碴便于清运。经过精心设计、合理施爆,达到了预期目的,为合理选择装药系数、黄土地基振动参数、飞石距离的校核提供了有益的经验。
The waterpressure blasting demolition of a coal loadingtrugh in a power plant is introduced in this paperThis blasting practice gained success by adopting meticulous design and stringent construction under complex surroundingsSome problems such as charge parameter,vibration parameter and flying stone distance are discussed

关键词(KeyWords): 拆除爆破,水压爆破
Waterpressure blasting Demolition blasting

Abstract:

Keywords:

基金项目(Foundation):

作者(Authors): 李伟,刘先魁,林素彬
Li Wei Liu Xiankui(Yellow River Engineering Technical Development Co;Zhengzhou 450003)Lin Subin(Shenzhen Water Resources Bureau;Guangdong 518122);