锦屏二级水电站2~#引水隧洞爆破治理岩爆试验研究
EXPERIMENTAL INVESTIGATION OF SOLVING ROCK BURST BY BLASTING MEANS IN 2~# DIVERSION TUNNEL AT JINPING TWO-STAGE POWER STATION

刘美山;杨建;葛文辉;张正宇;
LIU Mei-shan1,YANG Jian2,GE Wen-hui3,ZHANG Zheng-yu1(1.Yangtze River Scientific Institute,Wuhan 430010,China;2.Kunming Electricity Board of Yunnan Grid Corporation,Kunming 650118,China;3.Third Sub-bureau of Fourth Engineering Department of China Hydropower,Kunming 650225,China)

摘要(Abstract):

岩爆是地下工程的一大地质灾害,目前还没有成熟的预报和治理方法。利用爆破手段释放高地应力来减少岩爆,一直是地下工程施工研究的重要课题。在锦屏二级水电站2#引水隧洞,进行了爆破释放应力试验,分别试验了掌子面倾斜辐射孔和围岩内倾斜辐射孔两种方案。试验结果证明了爆破是高应力释放的有效手段,通过合理的爆破设计与施工,可以达到控制或缓解岩爆的目的。
Rock burst is a big geological disaster for underground engineering without preferable forecasting and solving means at present.Releasing high crustal stress by blasting means to decrease rock burst is always an important task for underground engineering construction.In 2# diversion tunnel at Jinping two-stage Power Station,stress release-blasting experiments(declining radiating holes at working face and adjoining rocks) were carried out.The experimentation proved that blasting was an effective means for stress release,by reasonable blasting design and construction,the result of controlling or decreasing rock burst could be achieved.

关键词(KeyWords): 引水隧洞;岩爆治理;应力释放爆破
Diversion tunnel;Rock burst treatment;Stress release-blasting

Abstract:

Keywords:

基金项目(Foundation): 中央级公益性科研院所基金项目(编号:CKSF2010019,单位代码:126202005)