摘要(Abstract):
以长河坝水电站泄洪放空系统及中期导流洞工程出口边坡爆破开挖为背景,分析了边坡爆破地震波对下邻地下洞室安全的影响。运用理论分析及现场监测等方法,在充分分析现场工程条件的基础上,确定了放空洞和3#泄洪洞的振动测点位置,共获得了21组爆破振动测试数据。结果表明:放空洞底脚处峰值振速为垂直方向4.32cm/s;3#泄洪洞洞壁距底板0.5m处的峰值振速为水平方向4.05cm/s;洞室与爆区的相对空间位置不同,其峰值振速所在的方向不同。认为尽管边坡爆破位于洞室群的上方且距离较近,但只要爆破方案及其参数控制得当,可以保证洞室群安全。
Based on the blasting excavation of the Changheba hydropower station and the excavation of the slope of the middle diversion tunnel,the impact of the slope blasting seismic wave on the safety of the underground chamber was analyzed.Based on the method of theoretical analysis and site monitoring,the vibration measurement points of the emptying tunnel and the 3#spillway were determined,and 21 sets of blasting vibration test data were obtained.The results showed that the peak velocity was 4.32cm/s in the vertical direction,and the peak velocity of the 3#spillway tunnel was 0.55cm/s from the bottom plate at0.5m;when the relative space position of the chamber and blasting area were different,the peak vibration velocity would be in different direction.We believe that,the slope blasting located close above the chambers,but as long as the blasting program and the parameters can be controlled properly,the champers would be safe.
关键词(KeyWords):
爆破工程;振动影响;高陡边坡;邻近洞室;放空洞
blasting engineering;vibration effect;high and steep slope;adjacent chamber;emptying tunnel
基金项目(Foundation):
作者(Authors):
田少敏;黄训洪;赵伟;
TIAN Shao-min;HUANG Xun-hong;ZHAO Wei;School of Civil Engineering,Southwest Jiaotong University;China Water Conservancy and Hydropower Seventh Engineering Bureau;
参考文献(References):
- [1]李宁,张承客,周钟.边坡爆破开挖对邻近已有洞室影响研究[J].岩石力学与工程学报,2012,31(2):3 471-3 477.LI N,ZHANG C K,ZHOU Z.Influence research of slope blasting excavation on adjacent existed tunnel[J].Rock Mechanics and Engineering,2012,31(2):3 471-3 477.
- [2]赵东平,王明年,贾玲利.路堑边坡开挖对邻近既有隧道影响研究[J].岩土力学,2009,30(5):1 399-1 402.ZHAO D P,WANG M N,JIA L L.Research on influence of excavating road trench slope on adjacent existing tunnel[J].Rock and Soil Mechanics,2009,30(5):1399-1402.
- [3]平琦,马芹永,徐晓核.水库坝区竖井开挖爆破技术及振动测试分析[J].地下空间与工程学报,2009,5(3):577-581.PING Q,MA Q Y,XU X H.Vibration measurement and analysis on control blasting technology for shaft excavation of the reservoir dam area[J].Underground Space and Engineering,2009,5(3):577-581.
- [4]李彬峰.爆破振动的分析方法及测试仪器系统探讨[J].爆破,2003,20(1):81-84.LI B F.Discussion of explosion vibration analysis methods and measuring and testing instrument system[J].Blasting,2003,20(1):81-84.
- [5]张志毅,杨年华,卢文波,等.中国爆破振动控制技术的新进展[J].爆破,2013,30(2):25-32.ZHANG Z Y,YANG N H,LU W B,et al.Progress of blasting vibration control technology in China[J].Blasting,2013,30(2):25-32.
- [6]汪旭光.中国工程爆破与爆破器材的现状及展望[J].工程爆破,2007,13(4):1-8.WANG X G.Current status and future prospect of engineering blasting and explosive materials in China[J].Engineering Blasting,2007,13(4):1-8.
- [7]傅洪贤.长距离小间距隧道爆破开挖设计与施工[J].工程爆破,2006,12(3):30-33.FU H X.Blasting design and construction of long distance with small clear space tunnel[J].Engineering Blasting,2006,12(3):30-33.
- [8]姚勇,何川,晏启祥,等.董家山隧道小净距段爆破控制研究[J].公路,2005(11):212-216.YAO Y,HE C,YAN Q X,et al.A study on blasting control of section with small clear space of Dongjiashan tunnel[J].Highway,2005(11):212-216.
- [9]阳生权,周健,李雪健.小净距公路隧道爆破振动观测与分析[J].工程爆破,2005,11(3):62-65.YANG S Q,ZHOU J,LI X J.Blasting vibration analysis of small clear space road tunnel[J].Engineering Blasting,2005,11(3):62-65.
- [10]闫鸿浩,李晓杰,曲艳东,等.爆破振动速度测试精细分析[J].岩土力学,2007,28(10):2 091-2 094.YAN H H,LI X J,QU Y D,et al.Fine analysis of blasting vibration velocity testing[J].Rock and Soil Mechanics,2007,28(10):2 091-2 094.
- [11]国家安全生产监督管理总局.爆破安全规程:GB 6722-2014[S].北京:中国标准出版社,2014.State Administration of Work Safety.Safety regulations for blasting:GB 6722-2014[S].Beijing:China Standards Press,2014.
- 爆破工程
- 振动影响
- 高陡边坡
- 邻近洞室
- 放空洞
blasting engineering - vibration effect
- high and steep slope
- adjacent chamber
- emptying tunnel
- 田少敏
- 黄训洪
- 赵伟
TIAN Shao-min- HUANG Xun-hong
- ZHAO Wei
- School of Civil Engineering
- Southwest Jiaotong University
- China Water Conservancy and Hydropower Seventh Engineering Bureau
- 田少敏
- 黄训洪
- 赵伟
TIAN Shao-min- HUANG Xun-hong
- ZHAO Wei
- School of Civil Engineering
- Southwest Jiaotong University
- China Water Conservancy and Hydropower Seventh Engineering Bureau