工程爆破

2012, v.18;No.67(01) 40-43

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Past Issue) | 高级检索(Advanced Search)

核岛负挖工程爆破振速分析与爆破参数优化
BLASTING VIBRATION VELOCITY ANALYSIS AND BLASTING PARAMETERS OPTIMIZATION IN EXCAVATING NUCLEAR ISLAND FOUNDATION PROJECT

王仁义;方向;郭涛;杨瑾焜;贾晓强;
WANG Ren-yi,FANG Xiang,GUO Tao,YANG Jin-kun,JIA Xiao-qiang(Engineering Institute of Engineer Corps.,PLA Univ.of Sci.& Tech.,Nanjing 210007,China)

摘要(Abstract):

介绍了桃花江核电厂核岛负挖工程的爆破振动监测,对不同参数条件下所获得的爆破振动速度监测数据,运用灰色关联法和回归分析,得出影响爆破振动因素主次关系和振速衰减规律,并依据分析结果,优化了爆破技术方案,降低了爆破振动。可为类似工程设计提供参考。
Blasting vibration velocity monitoring in excavating nuclear island foundation at Taohuajiang Nuclear Power Station was introduced.Monitoring data of blasting vibration under different parameters were analyzed by grey relation and regression analysis methods.The primary and secondary sequence of factors affecting blasting vibration and attenuation rule of blasting vibration velocity were obtained.Based on this,blasting scheme was optimized and blasting vibration was reduced.The project could be referenced by similar projects.

关键词(KeyWords): 核岛负挖;爆破振动监测;灰色关联法;回归分析
Nuclear island foundation excavation;Blasting vibration monitoring;Grey relation method;Regression

Abstract:

Keywords:

基金项目(Foundation):

作者(Authors): 王仁义;方向;郭涛;杨瑾焜;贾晓强;
WANG Ren-yi,FANG Xiang,GUO Tao,YANG Jin-kun,JIA Xiao-qiang(Engineering Institute of Engineer Corps.,PLA Univ.of Sci.& Tech.,Nanjing 210007,China)

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享