工程爆破

1997, (02)

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Past Issue) | 高级检索(Advanced Search)

承重空心墙结构建筑物的控爆拆除
DESTRUCTION OF A BUILDING OF HOLLOW BEARING WALL STRUCTURE BY CONTROLLED BLASTING

倪荣福,吴岩
Ni Rongfu Wu Yan (Engineering Institute, Engineering Corps, PLA,Nanjing 210007)

摘要(Abstract):

对罕见的承重空心墙结构楼房实施控制爆破,经多次试验,总结了一些经验,圆满地完成了爆破拆除任务,受到当地政府的好评。
This paper describes the demolition of a building of unusual hollow bearing wall structure by means of controlled blasting. The demolition was accomplished on the basis of experience gained through a number of on the spot tests. It was successful and received good comments from the local authority.

关键词(KeyWords): 拆除爆破,承重空心墙
Demolition blasting Hollow bearing wall

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 倪荣福,吴岩
Ni Rongfu Wu Yan (Engineering Institute, Engineering Corps, PLA,Nanjing 210007)

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享