西南铝加工厂二米八轧线设备基础切割拆除控爆
CUT-DEMOLISHING AND CONTROLLED BLASTING FOR A BASE OF 2.8M ROLLING MACHINE AT SOUTHWEST ALLUMINUM PROCESSING PLANT

李良佐
Li Liangzuo(Chongqing No. 2 Municipal Administration Company,Chongqing 630042)

摘要(Abstract):

二米八轧线整治改造中的钢筋混凝土设备基础切割拆除控爆,是在原基础上切割一部分,完好地保留另一部分,并且要在这保留的基础上扩大基础,使新说注的钢筋混凝土与旧的很好地结合,这是一次难度较大,工期紧迫的工程任务。本文主要介绍这次施工的经验。
In the transformation of a 2.8m rolling machine, the reinforced concrete base was cut-demolished and controlled-blasted.Part of it was cut,and part of it reserved,The reserved part of the base was expanded.The new poured reinforced concrete was well-combined with the reserved part.This was a difficult and pressing task.The experience for construction is mainly intro-duced in this paper.

关键词(KeyWords): 切割拆除,控制爆破
Cut-demolishing Controlled blasting

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 李良佐
Li Liangzuo(Chongqing No. 2 Municipal Administration Company,Chongqing 630042)