白登磷矿爆破参数优化的试验研究TEST RESEARCH ON OPTIMIZING BLASTING PARAMETERS IN BAIDENG PHOSPHORUS MINE
李洪超;栾龙发;张智宇;李祥龙;丁康云;张立国;
LI Hong-chao1,LUAN Long-fa1,ZHANG Zhi-yu1,LI Xiang-long1,DING Kang-yun2,ZHANG Li-guo3(1.Land and Resources Engineering College,Kunming University of Science and Technology,Kunming 650093,China;2.Baideng Phosphorus Mine of Yunnan Guangming Chemical Plant Co.Ltd.,Anning 650300,Yunnan,China;3.Yunnan Yulong Blasting Appraisal and Consulation Limited Company,Kunming 650093,China)
摘要(Abstract):
通过对影响白登磷矿深孔爆破效果原因的分析,并结合现场试验研究,进行了爆破参数和起爆网路的优化,有效地控制了采场爆破的大块率和根底率,取得了较好的社会效益和经济效益。
Through analyzing reasons which affected deep-hole blasting effect and field test research in Baideng Phosphorus Mine,blasting parameters and initiating network were optimized.Big rock ratio and tight bottoms ratio were well controlled after blasting at the stope,and good social and economic effects were gotten.
关键词(KeyWords):
白登磷矿;深孔爆破;爆破参数优化;起爆网路;试验研究
Baideng Phosphorus Mine;Deep-hole blasting;Blasting parameter optimization;Initiating network;Test research
基金项目(Foundation):
作者(Authors):
李洪超;栾龙发;张智宇;李祥龙;丁康云;张立国;
LI Hong-chao1,LUAN Long-fa1,ZHANG Zhi-yu1,LI Xiang-long1,DING Kang-yun2,ZHANG Li-guo3(1.Land and Resources Engineering College,Kunming University of Science and Technology,Kunming 650093,China;2.Baideng Phosphorus Mine of Yunnan Guangming Chemical Plant Co.Ltd.,Anning 650300,Yunnan,China;3.Yunnan Yulong Blasting Appraisal and Consulation Limited Company,Kunming 650093,China)
参考文献(References):
- [1]王永刚.露天深孔爆破减少根底大块的技术措施[J].露天采矿技术,2003,9(6):3-5.
- [2]张戈平.浅谈降低深孔梯段爆破大块率的措施[J].工程爆破,2009,15(2):48-51.
- [3]龙涛,余斌,胡建军.宜春钽铌矿凿岩爆破参数优化研究及应用[J].工程爆破,2009,7(2):43-45.
- [4]郑明钗.矿石质量分析与爆破参数优化[J].工程爆破,2009,1(9):52-54.
- [5]金小田,张电吉,胡振柱.露天台阶爆破炮孔填塞长度的研究[J].化工矿物与加工,2004,8(5):22-24.
- [6]罗勇,沈兆武.炮孔填塞对爆破作用效果的研究[J].工程爆破,2005,12(10):16-18.
- [7]庙延钢,栾龙发.爆破工程与安全技术[M].北京:化学工业出版社,2007.
- [8]齐金铎.降低露天矿根底率的技术措施[J].冶金矿山与冶金设备,1995,(3):9-11.
- 白登磷矿
- 深孔爆破
- 爆破参数优化
- 起爆网路
- 试验研究
Baideng Phosphorus Mine - Deep-hole blasting
- Blasting parameter optimization
- Initiating network
- Test research
- 李洪超
- 栾龙发
- 张智宇
- 李祥龙
- 丁康云
- 张立国
LI Hong-chao1- LUAN Long-fa1
- ZHANG Zhi-yu1
- LI Xiang-long1
- DING Kang-yun2
- ZHANG Li-guo3(1.Land and Resources Engineering College
- Kunming University of Science and Technology
- Kunming 650093
- China
- 2.Baideng Phosphorus Mine of Yunnan Guangming Chemical Plant Co.Ltd.
- Anning 650300
- Yunnan
- China
- 3.Yunnan Yulong Blasting Appraisal and Consulation Limited Company
- Kunming 650093
- China)
- 李洪超
- 栾龙发
- 张智宇
- 李祥龙
- 丁康云
- 张立国
LI Hong-chao1- LUAN Long-fa1
- ZHANG Zhi-yu1
- LI Xiang-long1
- DING Kang-yun2
- ZHANG Li-guo3(1.Land and Resources Engineering College
- Kunming University of Science and Technology
- Kunming 650093
- China
- 2.Baideng Phosphorus Mine of Yunnan Guangming Chemical Plant Co.Ltd.
- Anning 650300
- Yunnan
- China
- 3.Yunnan Yulong Blasting Appraisal and Consulation Limited Company
- Kunming 650093
- China)