工程爆破

1996, (04)

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

三峡水利枢纽一期工程的土石方开挖
EARTH AND ROCK EXCAVATION IN FIRST PHASE OF CONSTRUCTION OF THREE GORGES PROJECT

张宝声
Zhang Baosheng(China Yangtze River Three Gorges Project Development Corporation;

摘要(Abstract):

本文介绍了三峡水利枢纽一期工程土石方开挖的概况。针对其施工特点,介绍了所采用的一般技术措施;探讨了土石方开挖的主要技术问题,并提出作者的见解。
The general situation about the earth and cock excavation in first phase of construction of the Three Gorges Project is introduced in this paper.The general technical measures according to the excavative construction characteristics are described.The main problems of the earth and rock excavation is discussed and the writer's opinions put forward.

关键词(KeyWords): 三峡水利枢纽,土石方开挖
Three Gorges Project Earth and rock excavation

Abstract:

Keywords:

基金项目(Foundation):

作者(Authors): 张宝声
Zhang Baosheng(China Yangtze River Three Gorges Project Development Corporation;

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享