爆破开挖附近地铁隧道振动监测数值分析NUMERICAL ANALYSIS OF THE SUBWAY TUNNEL VIBRATION MONITORING NEAR THE BLASTING EXCAVATION
姜楠;邹锐;渠银录;徐全军;李志龙;
JIANG Nan1,ZOU Rui2,QU Yin-lu1,XU Quan-jun1,LI Zhi-long1 (1.Engineering Institute of Engineering Corps,PLA Univ.&Tech,Nanjing210007,China; 2.Nanjing Urban Construction Investment Holding (Group)Co.,Ltd.,Nanjing210002,China)
摘要(Abstract):
利用计算机数值模拟技术分析在既有地铁隧道附近进行隧道开挖时,使用掘进爆破对邻近地铁隧道的振动影响情况。通过计算爆破工作面距离地铁隧道不同位置的工况,得出地铁隧道截面各处的振动峰值速度,并与实际测量值进行比较分析,由此得到实际测点处速度峰值与地铁隧道内最大振动速度峰值的比值曲线和分布函数,从而对基于爆破振动安全阈值下的地铁隧道振动进行控制,对类似工程爆破振动监测可提供一定参考。
Blasting vibration effect on the existing subway tunnel produced from development blasting nearby which being under construction has been analyzed by using numerical simulation technology. Through numerical analysis on the condition of different distances between subway tunnel and blasting position,the peak velocities of different positions on the subway tunnel section were figured out and compared with the measured values,and then the ratio curve and distribution function of actual measuring points peak blasting velocities and the maximum peak blasting velocities were obtained.Thus was used to control the blasting vibration of subway tunnel and could provide a reference for similar projects.
关键词(KeyWords):
地铁隧道;爆破振动;振动监测;数值模拟
Subway tunnel;Blasting vibration;Vibration Monitoring;Numerical simulation
基金项目(Foundation):
作者(Authors):
姜楠;邹锐;渠银录;徐全军;李志龙;
JIANG Nan1,ZOU Rui2,QU Yin-lu1,XU Quan-jun1,LI Zhi-long1 (1.Engineering Institute of Engineering Corps,PLA Univ.&Tech,Nanjing210007,China; 2.Nanjing Urban Construction Investment Holding (Group)Co.,Ltd.,Nanjing210002,China)
参考文献(References):
- 〔1〕李夕兵,凌同华,张义平.爆破震动信号分析理论与技术[M].北京:科学出版社,2009.
- 〔2〕周向阳,徐全军,姜楠,等.上跨运行地铁的南京红山南路隧道爆破安全管理[J].工程爆破,2011,17(4):97-99.
- 〔3〕Langefors U,Westberg H,Kihlstrom B.Ground vibra-tion in blasting[J].Water Power,1958,10(9):335-421.
- 〔4〕中华人民共和国国家标准.爆破安全规程(GB6722-2003)[S].北京:中国标准出版社,2004.
- 〔5〕郭建群,张继春,曹孝君,等.穿越高楼下的浅埋隧道掘进控制爆破技术[J].爆破,2003,20(1):28-31.
- 〔6〕彭道富,李忠献,杨年华.近距离爆破对既有隧道的振动影响[J].中国铁道科学,2005,26(4):73-76.
- 〔7〕朱红阳,万尧方.熊渡隧道小净距爆破振动监测与分析[J].土工基础,2011,25(1):33-36.
- 〔8〕Kury J W,Hornig H C.Metal Acceleration by Chemi-cal Explosives[A].Naval Ordnance Laboratory.Fourth Symposium on Detonation[C].Washington D.C.:Office of Naval Research,1965:3-13.
- 〔9〕AUTODYN Theory Manual Version4.3[Z].USA:Century Dynamic Corporation,2005.
- 〔10〕Thomas J A.Rock physics&phase relations:a hand-book of physical constant[M].USA:American Geo-physical Union,1995.
- 〔11〕谢先启.精细爆破[M].武汉:华中科技大学出版社,2010.
- 姜楠
- 邹锐
- 渠银录
- 徐全军
- 李志龙
JIANG Nan1- ZOU Rui2
- QU Yin-lu1
- XU Quan-jun1
- LI Zhi-long1 (1.Engineering Institute of Engineering Corps
- PLA Univ.&Tech
- Nanjing210007
- China
- 2.Nanjing Urban Construction Investment Holding (Group)Co.
- Ltd.
- Nanjing210002
- China)
- 姜楠
- 邹锐
- 渠银录
- 徐全军
- 李志龙
JIANG Nan1- ZOU Rui2
- QU Yin-lu1
- XU Quan-jun1
- LI Zhi-long1 (1.Engineering Institute of Engineering Corps
- PLA Univ.&Tech
- Nanjing210007
- China
- 2.Nanjing Urban Construction Investment Holding (Group)Co.
- Ltd.
- Nanjing210002
- China)