1.2万千瓦发电厂房控制爆破拆除
DEMOLITION OF POWER PLANT WORKSHOP OF 12000KW BY CONTROLLED BLASTING

傅菊根;宗琦;汪海波;周胜兵;袁彬;
FU Ju-gen,ZONG Qi,WANG Hai-bo,ZHOU Sheng-bing,YUAN Bin (School of Civil Engineering and Architectural,Anhui University of Science and Technology,Huainan 232001,Anhui,China)

摘要(Abstract):

介绍了大唐洛河电厂1.2万kW发电厂房及栈桥控制爆破拆除。通过爆破方案的选择、爆破参数设计、爆破振动测量、最大一段起爆药量验算、起爆顺序确定、爆破安全校核及其防护措施等,达到了预期爆破效果,对类似工程有一定的参考价值。
The paper introduced the successful demolition of workshop of Datang Luohe Power Plant of 12000kW and its framed trestle by controlled blasting and elaborated the determination of blasting program,the design of blasting parameters,the measurement of blasting vibration,the checking calculations of maximum initiating explosive for one phase,the determination of ignition sequence as well as the check of blasting safety and safety measures.The success demolition is valuable to familiar project.

关键词(KeyWords): 发电厂;厂房;栈桥;控制爆破拆除
Power plant;Workshop;Framed trestle;Controlled blasting demolition

Abstract:

Keywords:

基金项目(Foundation): 安徽省高校科技创新团队(TD200705)

作者(Authors): 傅菊根;宗琦;汪海波;周胜兵;袁彬;
FU Ju-gen,ZONG Qi,WANG Hai-bo,ZHOU Sheng-bing,YUAN Bin (School of Civil Engineering and Architectural,Anhui University of Science and Technology,Huainan 232001,Anhui,China)