隧道爆破对大坝振动影响监测分析
MONITORING AND ANALYSIS FOR VIBRATION INFLUENCE OF THE TUNNEL BLASTING ON DAM

朱华;李进;邓成发;戴春华;
ZHU Hua1,LI Jin2,DENG Cheng-fa3,DAI Chun-hua3(1.Civil Engineering College of Yancheng Institute of Technology,Yancheng 224051,Jiangsu,China; 2.Nanjing Water Planning and Designing Institute Co.,Ltd.,Nanjing 210022,China; 3.Zhejiang Institute of Hydraulics and Estuary,Hangzhou 310020,China)

摘要(Abstract):

近区隧道开挖爆破会引起大坝产生振动响应,为确保大坝安全,对爆破振动进行监测分析,及时反馈指导爆破施工。利用db8小波基对坝基处振动信号进行小波分析,结果表明采用db8小波基处理爆破振动信号是可行的,爆破能量分布主要集中于15.625~250.000Hz频带之间,而非大坝基频所在的频带,最终得出爆破振动对大坝安全影响较小的结论,为同类工程提供参考。
Tunnel excavation blasting near a dam will cause vibration response,thus to ensure safety of the dam monitoring analysis for blasting vibration has been done in order to feedback blasting construction in time.By using of the db8 wavelet basis to analyze the vibration signal at the dam foundation,and the results showed that this method was feasible.The mainly distribution of blasting energy ranged from 15.625 to 250Hz,which not the frequency band of the dam foundation.Finally,the conclusion was acquired that the blasting vibration had little influence on the safety of the dam,and thus could provide a reference for similar projects.

关键词(KeyWords): 隧道爆破;振动监测;小波分析;大坝安全;频带
Tunnel blasting;Vibration monitoring;Wavelet analysis;Dam safety;Frequency band

Abstract:

Keywords:

基金项目(Foundation): 海塘工程实时安全监测及预测预警技术研究(201201043)