210 m高烟囱双切口同向折叠爆破拆除Blasting demolition of 210 m high chimney double notches by folding in the same direction
于淑宝;汪旭光;杨军;付占华;于泳海;
YU Shu-bao;WANG Xu-guang;YANG Jun;FU Zhan-hua;YU Yong-hai;School of Mechanics and Civil Engineering,China University of Mining and Technology;Tangshan Jinyu Blasting Engineering Co.,Ltd.;Beijing Institute of Mining and Metallurgy;State Key Laboratory of Explosion Science and Technology,School of Mechatronic Engineering,Beijing Institute of Technology;
摘要(Abstract):
为了安全拆除唐山市西郊热电厂区内210m高的烟囱,根据烟囱周围环境复杂和倒塌空间不足的特点,采取双切口同向折叠爆破拆除方案。通过数值模拟确定上、下切口延时间隔时间为3s。通过严格控制上、下切口延时时间及倒塌方向,确保了倒塌时烟囱不发生偏转及反向倒塌,并有效缩短了倒塌距离。采取铺设缓冲垫层、开挖减振沟等措施减小振动。采用草帘和钢丝网对炮孔进行覆盖,防止爆破飞石的扩散。爆破未对周围建筑产生影响,达到预期倒塌效果,可为类似工程提供参考。
In order to safely demolish the 210 m chimney in the Tangshan Xijiao Thermal Power Plant,according to the characteristics of complex environment around the chimney and the lack of space collapse,the blasting demolition program of double notches in the same direction by folding was taken.Through numerical simulation the upper and lower notch delay time interval of 3 swas determined.Through strict control of the upper and lower notch delay time and direction of collapse,it ensures that the chimney does not deflect and reverse collapse when it collapses and it effectively shortens the collapse distance.The vibration was reduced by laying a cushion and excavating damping ditch.The straw curtains and steel mesh was used to cover the blasthole to prevent the spread of blasting flying rocks.The surrounding buildings were not affected.The expected collapse effect was achieved and it can provide a reference for similar projects.
关键词(KeyWords):
烟囱;爆破拆除;数值模拟;双切口;同向折叠
chimney;blasting demolition;numerical simulation;double notches;folding in the same direction
基金项目(Foundation):
作者(Authors):
于淑宝;汪旭光;杨军;付占华;于泳海;
YU Shu-bao;WANG Xu-guang;YANG Jun;FU Zhan-hua;YU Yong-hai;School of Mechanics and Civil Engineering,China University of Mining and Technology;Tangshan Jinyu Blasting Engineering Co.,Ltd.;Beijing Institute of Mining and Metallurgy;State Key Laboratory of Explosion Science and Technology,School of Mechatronic Engineering,Beijing Institute of Technology;
参考文献(References):
- [1]郑炳旭.中国爆破新技术Ⅲ[M].北京:冶金工业出版社,2012:659-681.ZHENG B X.New blasting technology in ChinaⅢ[M].Beijing:Metallurgical Industry Press,2012:659-681.
- [2]汪旭光.爆破手册[M].北京:冶金工业出版社,2010:954-957.WANG X G.Handbook of blasting[M].Beijing:Metallurgical Industry Press,2010:954-957.
- [3]刘殿书.中国爆破新技术Ⅱ[M].北京:冶金工业出版社,2008:485-486.LIU D S.New blasting technology in ChinaⅡ[M].Beijing:Metallurgical Industry Press,2008:485-486.
- [4]王晨,高文乐,方昌华,等.100 m高钢筋混凝土烟囱的双向折叠爆破拆除[J].工程爆破,2010,16(3):68-71.WANG C,GAO W L,FANG C H,et al.Bidirectional folding blasting demolition of a 100 m high reinforced concrete chimney[J].Engineering Blasting,2010,16(3):68-71.
- [5]国家安全生产监督管理总局.爆破安全规程:GB 6722-2014[S].北京:中国标准出版社,2015.State Administration of Work Safety.Safety regulations for blasting:GB 6722-2014[S].Beijing:China Standards Press,2015.
- [6]张英才,张海涛,董保立,等.复杂环境下150m砼烟囱两段单向控制爆破技术[J].工程爆破,2014,20(6):16-20.ZHANG Y C,ZHANG H T,DONG B L,et al.The unidirectional controlled blasting technology under complicated environment in two sections of a 150 mreinforced concrete chimney[J].Engineering Blasting,2014,20(6):16-20.
- [7]褚怀保,乔俊凤,张英才,等.180 m高钢筋混凝土烟囱三段单向控制爆破拆除[J].工程爆破,2010,16(4):61-63.CHU H B,QIAO J F,ZHANG Y C,et al.Demolition of a 180mhigh reinforced concrete chimney by three sections one-way controlled blasting[J].Engineering Blasting,2010,16(4):61-63.
- 烟囱
- 爆破拆除
- 数值模拟
- 双切口
- 同向折叠
chimney - blasting demolition
- numerical simulation
- double notches
- folding in the same direction
- 于淑宝
- 汪旭光
- 杨军
- 付占华
- 于泳海
YU Shu-bao- WANG Xu-guang
- YANG Jun
- FU Zhan-hua
- YU Yong-hai
- School of Mechanics and Civil Engineering
- China University of Mining and Technology
- Tangshan Jinyu Blasting Engineering Co.
- Ltd.
- Beijing Institute of Mining and Metallurgy
- State Key Laboratory of Explosion Science and Technology
- School of Mechatronic Engineering
- Beijing Institute of Technology
- 于淑宝
- 汪旭光
- 杨军
- 付占华
- 于泳海
YU Shu-bao- WANG Xu-guang
- YANG Jun
- FU Zhan-hua
- YU Yong-hai
- School of Mechanics and Civil Engineering
- China University of Mining and Technology
- Tangshan Jinyu Blasting Engineering Co.
- Ltd.
- Beijing Institute of Mining and Metallurgy
- State Key Laboratory of Explosion Science and Technology
- School of Mechatronic Engineering
- Beijing Institute of Technology