高地温隧道施工的爆破安全技术Blasting safety technology of high ground temperature tunnel construction
朱胥仁;苗永旺;陈佐林;李传书;曹振兴;刘鳌;
ZHU Xu-ren;MIAO Yong-wang;CHEN Zuo-lin;LI Chuan-shu;CAO Zhen-xing;LIU Ao;Railway No.5 Bureau Group First Engineering Co.,Ltd;School of Civil Engineering, Central South University;
摘要(Abstract):
针对高地温隧道爆破施工条件恶劣,爆破器材不稳定的问题,通过采取综合降温措施降低施工环境温度和炮孔温度,有效解决了高温对施工人员及爆破器材不良影响的问题;根据不同温度等级设置了对应的爆破器材和装药结构,保证了爆破器材在高温环境下的稳定性;采取水压爆破和选用并簇联法的起爆网路,保证了爆破施工安全。较好地解决了桑珠岭隧道穿越高地温洞段的钻爆施工安全控制难题,对于类似工程的实施具有一定的指导作用。
Aiming at the problems of bad blasting construction conditions and unstable blasting equipment in tunnel with high ground temperature, by taking comprehensive cooling measures to reduce the temperature of the construction environment and the blasthole temperature, it effectively solves the problem of the adverse effect of the high-temperature environment on the construction personnel and explosive materials. According to the different levels corresponding explosive materials and charge structures were setted to ensure the explosive materials stability under high temperature environment. Hydraulic blasting and initiating network with parallel cluster method were adopted to ensure the safety of blasting construction. It solves the problem of safety control of drilling and blasting in Sangzhuling tunnel through the tunnel section with high ground temperature, and has a certain guiding role for the implementation of similar projects.
关键词(KeyWords):
高地温隧道;钻爆施工;爆破器材;施工安全
high ground temperature tunnel;drilling and blasting construction;explosive materials;construction safety
基金项目(Foundation):
作者(Authors):
朱胥仁;苗永旺;陈佐林;李传书;曹振兴;刘鳌;
ZHU Xu-ren;MIAO Yong-wang;CHEN Zuo-lin;LI Chuan-shu;CAO Zhen-xing;LIU Ao;Railway No.5 Bureau Group First Engineering Co.,Ltd;School of Civil Engineering, Central South University;
参考文献(References):
- [1] 黄润秋,王贤能.深埋隧道工程主要灾害地质问题分析[J].水文地质工程地质,1998(4):23-26.HUANG R Q,WANG X N.Analysis of major disaster geological problems of deep-buried tunnel engineering [J].Hydrogeological Engineering Geology,1998 (4):23-26.
- [2] 袁培国.超高地温条件下引水隧洞施工关键技术探讨[J].水利水电技术,2014,45(4):101-106.YUAN P G.Discussion on key technologies of diversion tunnel construction under ultra-high ground temperature conditions[J].Water Resources and Hydropower Technology,2014,45(4):101-106.
- [3] 国家安全生产监督管理总局.爆破安全规程:GB 6722-2014[S].北京:中国标准出版社,2015.State Administration of Work Safety.Safety regulations for blasting:GB 6722-2014[S].Beijing:China Standards Press,2015.
- [4] 周名辉,唐洪佩,杨开山.露天煤矿高温爆破技术研究[J].爆破,2014,31(2):119-122.ZHOU M H,TANG H P,YANG K S.Research on high temperature blasting technology in open pit coal mines[J].Blasting,2014,31(2):119-122.
- [5] 崔晓荣.露天煤矿高温爆破施工工艺与组织管理[J].爆破,2016,33(2):149-154.CUI X R.Construction technology and organization management of high temperature blasting in open pit coal mines[J].Blasting,2016,33(2):149-154.
- [6] 许晨,李克民,李晋旭,等.露天煤矿高温火区爆破的安全技术探究[J].露天采矿技术,2010(4):73-75.XU C,LI K M,LI J X,et al.Exploring the safety technology of blasting in high temperature fire area of open pit coal mine[J].Open Pit Mining Technology,2010(4):73-75.
- [7] 蔡建德.露天煤矿高温区爆破安全作业技术研究[J].工程爆破,2013,19(1):92-95.CAI J D.Research on safe operation technology of blasting in high temperature area of open pit coal mine[J].Engineering Blasting,2013,19(1):92-95.
- [8] 周菊兰,郑道明.地下工程施工中高地温、高温热水治理技术研究[J].四川水力发电,2011,30(5):81-84.ZHOU J L,ZHENG D M.Research on treatment technology of high ground temperature and high temperature hot water in underground engineering construction [J].Sichuan Hydropower,2011,30(5):81-84.
- [9] 罗雪阳,贾建华,陈立顺.高地热条件下引水隧洞的降温措施及爆破方案[J].华北水利水电学院学报,2010,31(5):125-127.LUO X Y,JIA J H,CHEN L S.Cooling measures and blasting scheme of diversion tunnel under high geothermal conditions [J].Journal of North China Institute of Water Conservancy and Hydroelectric Power,2010,31(5):125-127.
- [10] 张智,胡元芳.深埋隧道人工制冷施工降温措施探讨[J].世界隧道,1999(6):22-25.ZHANG Z,HU Y F.Discussion on temperature reduction measures for artificial refrigeration construction of deep-buried tunnels [J].World Tunnels,1999(6):22-25.
- 高地温隧道
- 钻爆施工
- 爆破器材
- 施工安全
high ground temperature tunnel - drilling and blasting construction
- explosive materials
- construction safety
- 朱胥仁
- 苗永旺
- 陈佐林
- 李传书
- 曹振兴
- 刘鳌
ZHU Xu-ren- MIAO Yong-wang
- CHEN Zuo-lin
- LI Chuan-shu
- CAO Zhen-xing
- LIU Ao
- Railway No.5 Bureau Group First Engineering Co.
- Ltd
- School of Civil Engineering
- Central South University
- 朱胥仁
- 苗永旺
- 陈佐林
- 李传书
- 曹振兴
- 刘鳌
ZHU Xu-ren- MIAO Yong-wang
- CHEN Zuo-lin
- LI Chuan-shu
- CAO Zhen-xing
- LIU Ao
- Railway No.5 Bureau Group First Engineering Co.
- Ltd
- School of Civil Engineering
- Central South University