热电厂取水泵房拱围堰拆除爆破Demolition blasting of arch cofferdam in water intake pump room of thermal power plant
高尚;华天波;李洪涛;姚强;杨兴国;
GAO Shang;HUA Tian-bo;LI Hong-tao;YAO Qiang;YANG Xing-guo;College of Water Resource and Hydropower,Sichuan University;State Key Laboratory of Hydraulics and Mountain River Engineering;
摘要(Abstract):
针对热电厂取水泵房混凝土拱围堰周边环境复杂、安全防护要求高的特点,从降低爆破危害效应入手,采取充水平压、局部拆除的一次爆破拆除方案。为减小爆破飞石、振动影响,同时保证破碎效果,选取当地资源丰富的毛竹悬挂遮挡飞石,并采用分层间隔装药、孔内分段、孔外接力的工程措施。对爆破振动波形进行了监测及分析,发现爆破振动出现了一定的叠加,分析其原因。同时采取PVC管预装药、精确计量分段填塞物质、预制填塞沙袋和严格的现场操作控制及管理措施,规避了孔内分段可能存在的安全风险,保证了爆破效果。
Aiming at the complicated environment and high security requirement of the concrete arch cofferdam of the water intake pump room of thermal power plant,the primary blasting demolition scheme of water filling and local dismantling was adopted from the point of reducing blasting damage effect.In order to reduce the effect of blasting flying socks and vibration and ensure the effect of crushing,the local resource-rich bamboo flyover was chosen to block the flying socks and the engineering measures were adopted to separate interval charge and blasthole external relay.The blasting vibration waveform was monitored and analyzed,and it was found that the blasting vibration had a certain superposition and its reason was analyzed.Meanwhile,the prefabricated PVC pipe,the accurate metering stemmings,the prefabricated sandbag and the strict on-site operation control and management measures were adopted to avoid the possible safety risk and ensured the blasting effect.
关键词(KeyWords):
围堰拆除;拆除爆破;振动叠加;设计方案;爆破施工
cofferdam demolition;demolition blasting;vibration superposition;design scheme;blasting implementation
基金项目(Foundation): 国家科技支撑计划资助项目(2014BAB03B00)
作者(Authors):
高尚;华天波;李洪涛;姚强;杨兴国;
GAO Shang;HUA Tian-bo;LI Hong-tao;YAO Qiang;YANG Xing-guo;College of Water Resource and Hydropower,Sichuan University;State Key Laboratory of Hydraulics and Mountain River Engineering;
参考文献(References):
- [1]张正宇,张文煊,吴新霞.现代水利水电工程爆破[M].北京:中国水利水电出版社,2003:226-271.ZHANG Z Y,ZHANG W X,WU X X.Modern water conservancy and hydropower engineering[M].Beijing:China Water&Power Press,2003:226-271.
- [2]赵根,吴新霞,刘美山,等.水工围堰拆除爆破[M].北京:中国水利水电出版社,2009:2-19.ZHAO G,WU X X,LIU M S,et al.Hydraulic cofferdam demolition blasting[M].Beijing:China Water&Power Press,2009:2-19.
- [3]国家安全生产监督管理.爆破安全规程:GB 6722-2014[S].北京:中国标准出版社,2014.State Administration of Work Safety.Safety regulations for blasting:GB 6722-2014[S].Beijing:China Standards Press,2014.
- [4]姚强,杨兴国,陈新,等.热电厂取水泵房混凝土拱围堰拆除爆破振动监测[J].爆破,2013,30(3):142-146.YAO Q,YANG X G,CHEN X,et al.Blasting vibration monitoring of Pumping station during demolition of concrete arch cofferdam in thermal power[J].Blasting,2013,30(3):142-146.
- [5]王勇胜,杨兴国,姚强,等.唐家山堰塞湖泄洪洞进口预留岩埂拆除爆破[J].爆破,2013,30(3):75-79.WANG Y S,YANG X G,YAO Q,et al.Explosive demolition for reserved intake rock-dyke of spillway tunnel at tangjiashan barrier lake[J].Blasting,2013,30(3):75-79.
- [6]占学军,任贤斌,张晓平.石门坎大坝栈桥桥墩爆破倾倒历时及振动效应分析[J].长江科学院院报,2012,29(7):41-44.ZHAN X J,REN X B,ZHANG X P.Toppling duration and vibration effect caused by blasting of hydraulic trestle pier[J].Journal of Yangtze River Scientific Research Institute,2012,29(7):41-44.
- [7]李文成,许志勇,姚强,等.黄金坪水电站导流洞进口围堰拆除爆破[J].四川水力发电,2012,31(2):149-151.LI W C,XU Z Y,YAO Q,et al.Explosive demolition of intake cofferdam of diversion tunnel on Huangjinping Hydropower Station[J].Sichuan Water Power,2012,31(2):149-151.
- [8]刘美山,张正宇,李永池,等.乌江构皮滩水电站导流隧洞进口围堰爆破拆除[J].工程爆破,2005,11(1):25-29.LIU M S,ZHANG Z Y,LI Y C,et al.Blasting demolition of cofferdam inlet of water diversiontunnel at Goupitan hydropower station[J].Engineering Blasting,2005,11(1):25-29.
- 围堰拆除
- 拆除爆破
- 振动叠加
- 设计方案
- 爆破施工
cofferdam demolition - demolition blasting
- vibration superposition
- design scheme
- blasting implementation
- 高尚
- 华天波
- 李洪涛
- 姚强
- 杨兴国
GAO Shang- HUA Tian-bo
- LI Hong-tao
- YAO Qiang
- YANG Xing-guo
- College of Water Resource and Hydropower
- Sichuan University
- State Key Laboratory of Hydraulics and Mountain River Engineering
- 高尚
- 华天波
- 李洪涛
- 姚强
- 杨兴国
GAO Shang- HUA Tian-bo
- LI Hong-tao
- YAO Qiang
- YANG Xing-guo
- College of Water Resource and Hydropower
- Sichuan University
- State Key Laboratory of Hydraulics and Mountain River Engineering