复杂环境下既有线路堑双向拓宽石方控制爆破STONEWORK CONTROLLED BLASTING OF THE EXISTING DOUBLE RAILWAY IN ROAD CUTTING EXTENSION CONSTRUCTION UNDER COMPLICATED ENVIRONMENT
张辉;代德龙;孙江;
ZHANG Hui1,DAI De-long2,SUN Jiang2(1.No.2 Engineering Co.,Ltd.of No.9 Bureau of China Railway Group Company,Jilin 132001,China;2.Blasting Engineering Co.,Ltd.of No.9 Bureau of China Railway Group Company,Shenyang 110002,China)
摘要(Abstract):
结合仙游车站拓堑工程,介绍了短时间、大方量、复杂环境下既有线石方控制爆破的方案及爆破参数的计算方式,该爆破方案既确保了施工安全、又满足施工进度及技术要求,达到了预期的效果。
Combined with the road cutting extension project of Xianyou railway station,it introduced the controlled blasting scheme and blasting parameter calculation mode for the stonework of existing lines under the condition of short time,a large number of rocks and complicated environment.This blasting scheme not only ensured construction safety,but also met the requirements of construction progress and techniques.The desired results were achieved.
关键词(KeyWords):
既有线;控制爆破;拓堑;深孔爆破
Existing railway;Controlled blasting;Road cutting extension;Deep-hole blasting
基金项目(Foundation):
作者(Authors):
张辉;代德龙;孙江;
ZHANG Hui1,DAI De-long2,SUN Jiang2(1.No.2 Engineering Co.,Ltd.of No.9 Bureau of China Railway Group Company,Jilin 132001,China;2.Blasting Engineering Co.,Ltd.of No.9 Bureau of China Railway Group Company,Shenyang 110002,China)
- 张辉
- 代德龙
- 孙江
ZHANG Hui1- DAI De-long2
- SUN Jiang2(1.No.2 Engineering Co.
- Ltd.of No.9 Bureau of China Railway Group Company
- Jilin 132001
- China
- 2.Blasting Engineering Co.
- Ltd.of No.9 Bureau of China Railway Group Company
- Shenyang 110002
- China)
- 张辉
- 代德龙
- 孙江
ZHANG Hui1- DAI De-long2
- SUN Jiang2(1.No.2 Engineering Co.
- Ltd.of No.9 Bureau of China Railway Group Company
- Jilin 132001
- China
- 2.Blasting Engineering Co.
- Ltd.of No.9 Bureau of China Railway Group Company
- Shenyang 110002
- China)