18层大厦双向三次折叠控制爆破技术THE CONTROLLED BLASTING TECHNOLOGY IN BIDIRECTION-3-TIMES-FOLDING OF 18-STOREY BUILDING
辛振坤,泮红星,骆利锋,王霞明,洪卫良
XIN Zhen-kun,PAN Hong-xing,LUO Li-feng,WANG Xia-ming,HONG Wei-liang
摘要(Abstract):
介绍了周边条件不能满足整体定向倾倒的复杂环境下,采用双向三次折叠控制爆破技术对18层电力大厦实施拆除,通过合理选择最佳倒塌方向、开设三个爆破切口、控制起爆延时及设置缓冲堤等安全防护措施,有效地解决了城市中高层建筑爆破倒塌空间受限及爆破振动危害等问题,可为类似工程提供借鉴。
The surrounding conditions can not meet the overall directional dumped in complicated environment.Bidirection-3-times-folding control blasting technology adopted to demolition of 18-storey building was introduced.The best direction collapse was selected,three blasting open incisions,controlled detonation delay and setting buffer embankment protection and other security measures were completed to effectively solve the high-rise buildings collapsed space limited in city blasting vibration damage and other issues.It could provide a reference for similar projects.
关键词(KeyWords):
复杂环境;高层建筑;双向三次折叠爆破;安全防护
Complicated environment;High-rise building;Bidirection-3-times-folding blasting;Safety protection
基金项目(Foundation):
作者(Author):
辛振坤,泮红星,骆利锋,王霞明,洪卫良
XIN Zhen-kun,PAN Hong-xing,LUO Li-feng,WANG Xia-ming,HONG Wei-liang
参考文献(References):
- 〔1〕汪旭光.爆破设计与施工[M].北京:冶金工业出版社,2011:201-203.WANG Xu-guang.Blasting Design and Construction[M].Beijing:Metallurgical Industry Press,2011:201-203.
- 〔2〕谢先启,韩传伟,刘昌邦.定向与双向三次折叠爆破拆除两栋19层框剪结构大楼[M]/刘殿书.中国爆破新技术Ⅱ.北京:冶金工业出版社,2008:366-370.XIE Xian-qi,HAN Chuan-wei,LIU Chang-bang.Directional and Bidirectional Three Folded Blasting Demolition Tall 19-Storey Frame Shear Wall Structure Building[M]/LIU Dian-shu.Chinese new Blasting Technology II.Beijing:Metallurgical Industry Press,2008:366-370.
- 〔3〕王霞明,程才林,顾平,等.2l层全剪力墙结构大楼的爆破拆除[M]/汪旭光.中国典型爆破工程与技术.北京:冶金工业出版社,2006:617-620.WANG Xia-ming,CHENG Cai-lin,GU Ping,et al.21Layer of Shear Wall Structure Building Blasting Demolition[M]/WANG Xu-guang.Typical Blasting Engineering and Technology in China.Beijing:Metallurgical Industry Press 2006:617-620.
- 〔4〕齐世福,刘定,谭雪刚,等.西湖第一高楼定向爆破拆除[J].工程爆破,2007,13(4):50-53.QI Shi-fu,LIU Ding,TAN Xue-gang,et al.West Lake First High-rise Directional Blasting Demolition[J].Engineering Blasting,2007,13(4):50-53.
- 〔5〕王霞明,程才林,辛振坤,等.十五层多边形框剪大楼的爆破拆除[J].工程爆破,2004,10(4):35-39.WANG Xia-ming,CHENG Cai-lin,XIN Zhen-kun,et al.On the Fifteenth Floor Polygon Frame Shear Wall Building Blasting Demolition[J].Blasting Engineering,2004,10(4):35-39.
- 〔6〕顾毅成,史雅语,金骥良.工程爆破安全[M].合肥:中国科学技术大学出版社,2009:542-543.GU Yi-cheng,SHI Ya-yu,JIN Ji-liang.Engineering Blasting Safety[M].Hefei:University of Science and Technology of China Press,2009:542-543.
- 〔7〕周家汉.爆破拆除塌落振动速度计算公式的讨论[J].工程爆破,2009,15(1):1-4.ZHOU Jia-han.Discussion on Calculation Formula of Collapsing Vibration Velocity Caused by Blasting Demolition[J].Blasting Engineering,2009,15(1):1-4.
- 复杂环境
- 高层建筑
- 双向三次折叠爆破
- 安全防护
Complicated environment - High-rise building
- Bidirection-3-times-folding blasting
- Safety protection