大峡导流明渠进口处挡水岩坎爆破拆除设计与施工DEMOLITION DESIGN AND CONSTRUCTION OF RETAINING ROCK BAR AT ENTRANCE OF DIVERSION CHANNEL IN DAXIA HYDROPOWER STATION
刘万忠
Liu Wanzhong(The Third Hydroelectric Construction Bureau of China;
摘要(Abstract):
黄河大峡水电站导流明渠施工期间,在进口处采用预留岩坎挡水。主河床截流前采用硐室双向抛掷爆破顺利完成了岩坎的拆除任务。本文介绍了预留岩坎爆破拆除的设计与施工。
During the construction of diversion channel in Daxia Hydropower Station in Yellow River, a retaining rock bar was reserved at entrance of diversion channel.Before the main river would be cut off, the rock bar was demoleted by coyote blasting with a way of throwing the broken rock in two directions.The main points of design in demolition of water retaining rock bar were presented in this paper.
关键词(KeyWords):
挡水岩坎,爆破拆除
Retaining rock bar Blasting demolition
基金项目(Foundation):
作者(Authors):
刘万忠
Liu Wanzhong(The Third Hydroelectric Construction Bureau of China;