采用爆炸挤淤置换法在较陡的斜坡海涂上修筑海堤,因堤身内外侧涂面高差大,施工过程中抛填堤身容易滑塌。最初在浙江舟山某海堤工程中遇到了这个难题。通过对堤身稳定性的计算分析,将堤身抛填方法调整为"内侧突前、外侧迟后",炸药布置侧重于内侧。既保证了施工期抛填堤身的稳定,又使得爆炸处理后形成的堤身断面满足设计要求。此后该方法又在多条类似海堤的施工中得到成功的应用,由此总结出了在斜坡海涂上修建海堤的爆炸挤淤技术,并申报了发明专利(201510908384.1)。
Explosion squeezing silt replacement method in seawall construction in steep ramp tideland was used.Because of the seawall height difference between the inside and outside,cast filling in the seawall construction process was liable to slump.The problem was first encountered in a seawall project in Zhoushan,Zhejiang province.Based on the calculation of the stability of the seawall,the seawall filling method was adjusted to "pushing the inside faster than the outside",and more explosives were put inside.The cast filling seawall stability during construction could be ensured,and the seawall section after explosion process could meet the design requirements.The explosion squeezing silt technology was summed up for seawall construction in ramp tideland,and it had been applied successfully in a number of similar seawall projects.It had declared a patent patent application number:201510908384.1.
关键词(KeyWords):
斜坡海涂;海堤;爆炸挤淤;抛填
Ramp tideland;Seawall;Explosion squeezing silt;Cast filling
基金项目(Foundation): 基金项目:浙江省科技厅近海结构冲击安全与健康监测创新团队(2013TD21)
作者(Authors):
蒋昭镳;江礼凡;江礼茂;王健;
JIANG Zhao-biao;JIANG Li-fan;JIANG Li-mao;WANG Jian;School of Mechanical Engineering and Mechanics,Ningbo University;Ningbo Kening Explosion Technology Engineering Co.,Ltd.;
参考文献(References):
- [1]江礼茂.控制加载爆炸挤淤置换法:ZL03119314.5[P].2003-3-13.JIANG Li-mao.Soft soil improvement by the controlled loading blasting replacement method:ZL 03119314.5[P].2003-3-13.
- [2]江礼凡,屈兴元,王江.等.爆炸挤淤置换法在浙江围垦工程中的应用和发展[J].浙江水利科技,2012,40(3):28-32.JIANG Li-fan,QU Xing-yuan,WANG Jiang,et al.Application and development of blasting replacement method in reclamation projects of Zhejiang[J].Zhejiang Hydrotechnics,2012,40(3):28-32.
- [3]江礼茂,许羿.控制加载爆炸挤淤置换法处理软基技术及其工程实践[J].土工基础.2011,25(5):27-30.JIANG Li-mao,XU Yu.Soft soil improvement by the controlled loading blasting replacement method and its engineering applications[J].Soil Engineering and Foundation,2011,25(5):27-30.
- [4]朱小敖.斜坡上爆炸置换法处理软基建筑海堤的工程实践[J].土工基础,2008,22(6):1-5.ZHU Xiao-ao.Using inclined ramp displacement method by blasting for building seawall in soft foundation[J].Soil Engineering and Foundation,2008,22(6):1-5.
- [5]屈兴元,江礼凡,王江,等.浙江省岱山县江南山围垦工程控制加载爆炸挤淤置换法处理软基竣工报告[R].宁波:宁波科宁爆炸技术工程有限公司,2008.QU Xing-yuan.JIANG Li-fan,WANG Jiang,et al.A completion report of soft soil improvement by the controlled loading blasting replacement method in reclamation projects in Jiangnanshan Daishan county Zhejiang province[R].Ningbo:Ningbo Kening Explosion Technology Engineering Co.,Ltd.,2008.
- 蒋昭镳
- 江礼凡
- 江礼茂
- 王健
JIANG Zhao-biao- JIANG Li-fan
- JIANG Li-mao
- WANG Jian
- School of Mechanical Engineering and Mechanics
- Ningbo University
- Ningbo Kening Explosion Technology Engineering Co.
- Ltd.
- 蒋昭镳
- 江礼凡
- 江礼茂
- 王健
JIANG Zhao-biao- JIANG Li-fan
- JIANG Li-mao
- WANG Jian
- School of Mechanical Engineering and Mechanics
- Ningbo University
- Ningbo Kening Explosion Technology Engineering Co.
- Ltd.