工程爆破

1999, (02) 10-14

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

动力电源起爆2000发以上电雷管爆破网络的设计与计算
DESIGNING AND CALCULATING OF BLASTING CIRCUIT WITH MORE THAN TWO THOUSAND CAPS FIRED BY TRIPHASE MAIN POWER

穆连生,宁掌玄,邸春生,于滨,陈寿峰
Mu Liansheng;Ning Zhangxuan (Datong Coal Industry School; Shanxi 037003)Di Chunsheng(Yongdingzhuang Coal Mine of Datong Coal Administration; Shanxi 037024)Yu Bin;Chen Shoufeng(China University of Mining and Technology (Beijing);

摘要(Abstract):

主要介绍用三相动力电源起爆大规模群组雷管爆破网络的设计与计算.采用三相动力电源起爆实属简便、易行且经济的方法.
This article mainly introduces design and calculation of the blasting network with large-group caps fired by triphase power supply. The blasting of using 3-phase power supply is an easy, simplified and economic method.

关键词(KeyWords): 动力电源;爆破网络;设计
Triphase power supply; Blasting network;Design

Abstract:

Keywords:

基金项目(Foundation):

作者(Authors): 穆连生,宁掌玄,邸春生,于滨,陈寿峰
Mu Liansheng;Ning Zhangxuan (Datong Coal Industry School; Shanxi 037003)Di Chunsheng(Yongdingzhuang Coal Mine of Datong Coal Administration; Shanxi 037024)Yu Bin;Chen Shoufeng(China University of Mining and Technology (Beijing);