三峡一期工程爆破施工技术与创新
BLASTING TECHNIQUES AND INNOVATION IN CONSTRUCTION OF PHASE I OF THE THREE GORGES PROJECT

周厚贵
Zhou Hougui (China Gezhouba Group Corporation, Yichang, Hubei 443002)

摘要(Abstract):

在简要介绍三峡一期土石方工程基本情况的基础上,针对土石方爆破施工着重论述了硐挖爆破、硐室爆破、水平光面爆破以及乳化炸药混装车等四项技术及创新。这些爆破技术在三峡一期工程中的改进、创新与应用,将为水利水电及其他行业的岩土工程施工提供宝贵经验
Based on briefing of phase I earth rock work of the Three Gorges Project(TGP), blasting techniques applied to the earth rock work, such as tunneling blasting, chamber blasting, horizontal smooth blasting as well as mixing charging truck for emulsion explosive have been introduced in this paper. Improvement, innovation and application of the above mentioned blasting techniques in the construction of phase I of the TGP will provide valuable experiences of engineering construction for water conservancy, hydroelectric industry and other industries.

关键词(KeyWords): 爆破技术;三峡工程;硐室爆破;水平光面爆破;炸药混装车
Blasting technique The Three Gorges Project(TGP) Chamber blasting Horizontal smooth blasting Mixing charging truck for explosives

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 周厚贵
Zhou Hougui (China Gezhouba Group Corporation, Yichang, Hubei 443002)

Email:

DOI:

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享